You need JavaScript to view this

Test and maintenance of the emergency power supply in the nuclear power plant Biblis

Abstract

Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)
Authors:
Kotthoff, K.; [1]  Huren, H. [2] 
  1. Gesellschaft fuer Reaktorsicherheit - GRS mbH, Schwertnergasse 1, D-5000 Koeln 1, Cologne (Germany)
  2. Rheinisch-Westfaelisches Elektrizitaetswerk AG, Betriebsverwaltung Biblis, Biblis (Germany)
Publication Date:
Feb 15, 1986
Product Type:
Conference
Report Number:
NEA-CSNI-R-1986-115
Resource Relation:
Conference: CSNI specialist meeting on operating experience relating to on-site electric power sources, London (United Kingdom), 16-18 Oct 1985; Related Information: In: Operating experience relating to on-site electric power sources. Proceedings of a Specialist Meeting| 399 p.
Subject:
42 ENGINEERING; 21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; BIBLIS-1 REACTOR; BIBLIS-2 REACTOR; CONNECTORS; CORROSION; CRACK PROPAGATION; DIESEL ENGINES; ELECTRIC BATTERIES; ELECTRIC GENERATORS; ELECTRICAL FAULTS; FAILURE MODE ANALYSIS; LEAKS; MAINTENANCE; ON-SITE POWER GENERATION; OUTAGES; RECTIFIERS; RELIABILITY; SPECIFICATIONS; TESTING
OSTI ID:
22505967
Research Organizations:
Organisation for Economic Co-Operation and Development, Nuclear Energy Agency - OECD/NEA, Committee on the Safety of Nuclear Installations - CSNI, 46 quai Alphonse Le Gallo, 92100 Boulogne Billancourt (France)
Country of Origin:
NEA
Language:
English
Other Identifying Numbers:
TRN: XN1600277076524
Availability:
Available from INIS in electronic form
Submitting Site:
INIS
Size:
page(s) 204-217
Announcement Date:
Aug 10, 2016

Citation Formats

Kotthoff, K., and Huren, H. Test and maintenance of the emergency power supply in the nuclear power plant Biblis. NEA: N. p., 1986. Web.
Kotthoff, K., & Huren, H. Test and maintenance of the emergency power supply in the nuclear power plant Biblis. NEA.
Kotthoff, K., and Huren, H. 1986. "Test and maintenance of the emergency power supply in the nuclear power plant Biblis." NEA.
@misc{etde_22505967,
title = {Test and maintenance of the emergency power supply in the nuclear power plant Biblis}
author = {Kotthoff, K., and Huren, H.}
abstractNote = {Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)}
place = {NEA}
year = {1986}
month = {Feb}
}