PE-3 - a high class pipeline; PE-3 - um oleoduto high-class

Abstract

Pipeline PE-3, with a length of approximately 17 Km mainly inside of Guanabara Bay, connects the refinery of Duque de Caxias to the terminal of the Ilha D'Agua. It is used to export dark products from the refinery. Product transfer, by operational necessity, is conducted at a temperature of 75 deg C. This introduces a considerable load of tension on the pipeline, in addition to creating a fatigue-inducing thermal cycle. Because of this, and unlike almost all other existing oil and gas pipelines, PE-3 posses a zig zag configuration, alternating a straight tube with a curve of 10 degrees. This stands out as an innovative concept. Their are only two other similar installations in the world, but in very different conditions, thus conferring a pioneering aspect on this pipeline. Due to its criticality, the pipeline is predicated on complete certification in its entirety, from design to operation and in adherence with the strictest requirements. The environmental conditions encountered along its right of way, and the constructive tolerances imposed by the project, obligate the adoption of constructive and technical solutions that are themselves innovative in the terrestrial and marine realms. The principal objective of this work is to present a general  More>>
Authors:
Hashiguchi, D Issao; Santos, J.A. Costa; Medeiros, A Roberto; [1]  Garcia, Amaury; [2]  Santos, F Cesar [3] 
  1. GDK Engenharia, Salvador, BA (Brazil)
  2. TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)
  3. Superpesa Transportes Especiais e Intermodais, Rio de Janeiro, RJ (Brazil)
Publication Date:
Jul 01, 2003
Product Type:
Conference
Report Number:
ETDE-BR-20987437
Resource Relation:
Conference: Rio pipeline 2003 conference and exposition, Rio de Janeiro, RJ (Brazil), 21-23 Oct 2003; Other Information: 1 fig., 2 tabs.
Subject:
42 ENGINEERING; PIPELINES; CONSTRUCTION; INSTALLATION; CONFIGURATION; HEAT FLUX; LOAD ANALYSIS; THERMAL FATIGUE
OSTI ID:
20987437
Research Organizations:
Instituto Brasileiro de Petroleo e Gas (IBP), Rio de Janeiro, RJ (Brazil)
Country of Origin:
Brazil
Language:
Portuguese
Other Identifying Numbers:
TRN: BR0801935
Availability:
Also available from the Library of the Brazilian Nuclear Energy Commission, Rio de Janeiro, in electronic form. Codes: IBP568_03; BR0801935.pdf; Commercial reproduction prohibited; OSTI as DE20987437
Submitting Site:
BR
Size:
[6] pages
Announcement Date:
Apr 07, 2008

Citation Formats

Hashiguchi, D Issao, Santos, J.A. Costa, Medeiros, A Roberto, Garcia, Amaury, and Santos, F Cesar. PE-3 - a high class pipeline; PE-3 - um oleoduto high-class. Brazil: N. p., 2003. Web.
Hashiguchi, D Issao, Santos, J.A. Costa, Medeiros, A Roberto, Garcia, Amaury, & Santos, F Cesar. PE-3 - a high class pipeline; PE-3 - um oleoduto high-class. Brazil.
Hashiguchi, D Issao, Santos, J.A. Costa, Medeiros, A Roberto, Garcia, Amaury, and Santos, F Cesar. 2003. "PE-3 - a high class pipeline; PE-3 - um oleoduto high-class." Brazil.
@misc{etde_20987437,
title = {PE-3 - a high class pipeline; PE-3 - um oleoduto high-class}
author = {Hashiguchi, D Issao, Santos, J.A. Costa, Medeiros, A Roberto, Garcia, Amaury, and Santos, F Cesar}
abstractNote = {Pipeline PE-3, with a length of approximately 17 Km mainly inside of Guanabara Bay, connects the refinery of Duque de Caxias to the terminal of the Ilha D'Agua. It is used to export dark products from the refinery. Product transfer, by operational necessity, is conducted at a temperature of 75 deg C. This introduces a considerable load of tension on the pipeline, in addition to creating a fatigue-inducing thermal cycle. Because of this, and unlike almost all other existing oil and gas pipelines, PE-3 posses a zig zag configuration, alternating a straight tube with a curve of 10 degrees. This stands out as an innovative concept. Their are only two other similar installations in the world, but in very different conditions, thus conferring a pioneering aspect on this pipeline. Due to its criticality, the pipeline is predicated on complete certification in its entirety, from design to operation and in adherence with the strictest requirements. The environmental conditions encountered along its right of way, and the constructive tolerances imposed by the project, obligate the adoption of constructive and technical solutions that are themselves innovative in the terrestrial and marine realms. The principal objective of this work is to present a general overview of the methodology employed in PE-3 construction, installation and assembly. (author)}
place = {Brazil}
year = {2003}
month = {Jul}
}