Methodology to relieve tensions in buried pipelines in areas of slow land moviment; Metodologia para alivio de tensoes em dutos enterrados em areas sujeitas a movimentacao lenta do solo

Abstract

This paper shows the methodology developed by TRANSPETRO Team of Geotecnia and used to relieve the MERLUZA pipeline tensions. After the problem is detect by usual Systematic Geotechnical Inspections and confirmed by direct and indirect measures, which identify deformations (curve model) caused by strength of land movement, this methodology is apply in this section. In this intervention the standard procedures consist on the following steps: test 'in situ' on the surface of pipeline iron; installation of instruments to measure the relief of tensions; controlled excavation of the ditch; installation of permanent instruments to measure the future new deformations and tensions; and the recomposition of the place with compact land. (author)
Authors:
Paula, Angelo J; Stanger, Daniel; Soares, Jose P; Novaes, Jose L; Bonini, Luis H; Moya, Marcelo; Sacramento, Waldemar; Ribeiro, Walter M [1] 
  1. TRANSPETRO - PETROBRAS Transporte, Rio de Janeiro, RJ (Brazil)
Publication Date:
Jul 01, 2005
Product Type:
Conference
Report Number:
ETDE-BR-20880703
Resource Relation:
Conference: Rio pipeline 2005 conference and exposition, Rio de Janeiro, RJ (Brazil), 17-19 Oct 2005; Other Information: 6 refs.,4 figs., 6 photos. Also available from the Library of the Brazilian Nuclear Energy Commission, Rio de Janeiro, in electronic form. Codes: IBP1276{sub 0}5; BR0701609.pdf
Subject:
42 ENGINEERING; PIPELINES; STRESS RELAXATION; DEFORMATION; MEASURING INSTRUMENTS; SOIL MECHANICS; IN-SITU PROCESSING; BRAZILIAN ORGANIZATIONS; EXCAVATION; MONITORING; EXTENSOMETERS
OSTI ID:
20880703
Research Organizations:
Instituto Brasileiro de Petroleo e Gas (IBP), Rio de Janeiro, RJ (Brazil)
Country of Origin:
Brazil
Language:
Portuguese
Other Identifying Numbers:
TRN: BR0701609
Availability:
Commercial reproduction prohibited; OSTI as DE20880703
Submitting Site:
BR
Size:
[8] pages
Announcement Date:
Jun 15, 2007

Citation Formats

Paula, Angelo J, Stanger, Daniel, Soares, Jose P, Novaes, Jose L, Bonini, Luis H, Moya, Marcelo, Sacramento, Waldemar, and Ribeiro, Walter M. Methodology to relieve tensions in buried pipelines in areas of slow land moviment; Metodologia para alivio de tensoes em dutos enterrados em areas sujeitas a movimentacao lenta do solo. Brazil: N. p., 2005. Web.
Paula, Angelo J, Stanger, Daniel, Soares, Jose P, Novaes, Jose L, Bonini, Luis H, Moya, Marcelo, Sacramento, Waldemar, & Ribeiro, Walter M. Methodology to relieve tensions in buried pipelines in areas of slow land moviment; Metodologia para alivio de tensoes em dutos enterrados em areas sujeitas a movimentacao lenta do solo. Brazil.
Paula, Angelo J, Stanger, Daniel, Soares, Jose P, Novaes, Jose L, Bonini, Luis H, Moya, Marcelo, Sacramento, Waldemar, and Ribeiro, Walter M. 2005. "Methodology to relieve tensions in buried pipelines in areas of slow land moviment; Metodologia para alivio de tensoes em dutos enterrados em areas sujeitas a movimentacao lenta do solo." Brazil.
@misc{etde_20880703,
title = {Methodology to relieve tensions in buried pipelines in areas of slow land moviment; Metodologia para alivio de tensoes em dutos enterrados em areas sujeitas a movimentacao lenta do solo}
author = {Paula, Angelo J, Stanger, Daniel, Soares, Jose P, Novaes, Jose L, Bonini, Luis H, Moya, Marcelo, Sacramento, Waldemar, and Ribeiro, Walter M}
abstractNote = {This paper shows the methodology developed by TRANSPETRO Team of Geotecnia and used to relieve the MERLUZA pipeline tensions. After the problem is detect by usual Systematic Geotechnical Inspections and confirmed by direct and indirect measures, which identify deformations (curve model) caused by strength of land movement, this methodology is apply in this section. In this intervention the standard procedures consist on the following steps: test 'in situ' on the surface of pipeline iron; installation of instruments to measure the relief of tensions; controlled excavation of the ditch; installation of permanent instruments to measure the future new deformations and tensions; and the recomposition of the place with compact land. (author)}
place = {Brazil}
year = {2005}
month = {Jul}
}