Abstract
The following tasks were completed during RA reactor refurbishment: vacuuming the gas system; vacuuming of the heavy water system for collecting the leftover heavy water; drying the heavy water system to remove the demineralized water; drying the distillation system; vacuuming the heavy water system before filling with heavy water; leak testing of the complete reactor system.
Nikolic, M;
Crnilovic, M
[1]
- Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)
Citation Formats
Nikolic, M, and Crnilovic, M.
Vacuuming and drying during refurbishment, Task 3.08/04-11; Podzadatak 3.08/04-11 Vakuumiranje i susenje u toku remonta.
Serbia and Montenegro: N. p.,
1963.
Web.
Nikolic, M, & Crnilovic, M.
Vacuuming and drying during refurbishment, Task 3.08/04-11; Podzadatak 3.08/04-11 Vakuumiranje i susenje u toku remonta.
Serbia and Montenegro.
Nikolic, M, and Crnilovic, M.
1963.
"Vacuuming and drying during refurbishment, Task 3.08/04-11; Podzadatak 3.08/04-11 Vakuumiranje i susenje u toku remonta."
Serbia and Montenegro.
@misc{etde_20877927,
title = {Vacuuming and drying during refurbishment, Task 3.08/04-11; Podzadatak 3.08/04-11 Vakuumiranje i susenje u toku remonta}
author = {Nikolic, M, and Crnilovic, M}
abstractNote = {The following tasks were completed during RA reactor refurbishment: vacuuming the gas system; vacuuming of the heavy water system for collecting the leftover heavy water; drying the heavy water system to remove the demineralized water; drying the distillation system; vacuuming the heavy water system before filling with heavy water; leak testing of the complete reactor system.}
place = {Serbia and Montenegro}
year = {1963}
month = {Dec}
}
title = {Vacuuming and drying during refurbishment, Task 3.08/04-11; Podzadatak 3.08/04-11 Vakuumiranje i susenje u toku remonta}
author = {Nikolic, M, and Crnilovic, M}
abstractNote = {The following tasks were completed during RA reactor refurbishment: vacuuming the gas system; vacuuming of the heavy water system for collecting the leftover heavy water; drying the heavy water system to remove the demineralized water; drying the distillation system; vacuuming the heavy water system before filling with heavy water; leak testing of the complete reactor system.}
place = {Serbia and Montenegro}
year = {1963}
month = {Dec}
}