You need JavaScript to view this

Annual report of the group for maintenance of electronic equipment; Godisnji izvestaj elektronske grupe

Abstract

Maintenance and repair of the RA reactor control and safety systems were uniformly distributed during the whole year and were done according to the annual plan. A series of repairs of he electronic equipment as well as exchange of electronic components and elec tonic tubes. The testing and calibration of control and protection circuits were done regularly according to the needs and operation state of the reactor and according to the instructions. Inspections, repairs and reconstructions well as operating characteristics of individual elements as well as complete electronic circuits during 1965 have shown da the systems of control and safety are still in good condition. Somewhat higher number of failures due to aging of electronic tubes is a regular consequence of equipment and instrumentation aging. [Serbo-Croat] Remontni radovi na opremi sistema za upravljanje i sigurnost reaktora RA ravnomerno su rasporedjeni tokom cele godine i obavljaju se prema planu remonta. Izvrsen je citav niz popravki elektronske instrumentacije, kao i zamena komponenti i elektronskih cevi. Sve kontrole ispravnosti i kalibracije lanaca za upravljanje i zastitu reaktora redovno su vrsene prema potrebi i u vezi sa radnim stanjem reaktora prema uputstvu za ove operacije. Pregledi, remonti i popravke kao i radne karakteristike pojedinih  More>>
Authors:
Popovic, B [1] 
  1. Reaktor RA, Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Publication Date:
Dec 15, 1965
Product Type:
Technical Report
Report Number:
INIS-CS-0065; RA-214/R3/P3/58/10
Resource Relation:
Other Information: 4 tabs, 13 figs, 5 refs; 17 tabs, 13 figs, 5 refs; Related Information: In: Annual report of the maintenance division for 1965, Godisnji izvestaj Odelenja odrzavanja za 1965. g, by Nikolic, M. [Reaktor RA, Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)], 236 pages.
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; AGING; ELECTRON TUBES; ELECTRONIC EQUIPMENT; ENGINEERED SAFETY SYSTEMS; FAILURES; R-A REACTOR; REACTOR CONTROL SYSTEMS; REACTOR PROTECTION SYSTEMS; REACTOR SAFETY
OSTI ID:
20818334
Country of Origin:
Serbia and Montenegro
Language:
English
Other Identifying Numbers:
TRN: CS06RA421118474
Availability:
Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca
Submitting Site:
INIS
Size:
page(s) 81
Announcement Date:
Dec 30, 2006

Citation Formats

Popovic, B. Annual report of the group for maintenance of electronic equipment; Godisnji izvestaj elektronske grupe. Serbia and Montenegro: N. p., 1965. Web.
Popovic, B. Annual report of the group for maintenance of electronic equipment; Godisnji izvestaj elektronske grupe. Serbia and Montenegro.
Popovic, B. 1965. "Annual report of the group for maintenance of electronic equipment; Godisnji izvestaj elektronske grupe." Serbia and Montenegro.
@misc{etde_20818334,
title = {Annual report of the group for maintenance of electronic equipment; Godisnji izvestaj elektronske grupe}
author = {Popovic, B}
abstractNote = {Maintenance and repair of the RA reactor control and safety systems were uniformly distributed during the whole year and were done according to the annual plan. A series of repairs of he electronic equipment as well as exchange of electronic components and elec tonic tubes. The testing and calibration of control and protection circuits were done regularly according to the needs and operation state of the reactor and according to the instructions. Inspections, repairs and reconstructions well as operating characteristics of individual elements as well as complete electronic circuits during 1965 have shown da the systems of control and safety are still in good condition. Somewhat higher number of failures due to aging of electronic tubes is a regular consequence of equipment and instrumentation aging. [Serbo-Croat] Remontni radovi na opremi sistema za upravljanje i sigurnost reaktora RA ravnomerno su rasporedjeni tokom cele godine i obavljaju se prema planu remonta. Izvrsen je citav niz popravki elektronske instrumentacije, kao i zamena komponenti i elektronskih cevi. Sve kontrole ispravnosti i kalibracije lanaca za upravljanje i zastitu reaktora redovno su vrsene prema potrebi i u vezi sa radnim stanjem reaktora prema uputstvu za ove operacije. Pregledi, remonti i popravke kao i radne karakteristike pojedinih elemenata kao i kompletnih instrumentalnih kontrolnih lanaca u toku 1965. godine pokazali su da su sistemi upravljanja i sigurnosne zastite jos u dobrom stanju. Nesto veci broj kvarova usled starenja elektronskih cevi je normalna posledica starenja opreme i instrumentacije.}
place = {Serbia and Montenegro}
year = {1965}
month = {Dec}
}