You need JavaScript to view this

Conclusion of the commission for determining wear out of Avala heavy water pump bearings - Annex 1; Prilog1 - Zakljucak komisije za utvrdjivanje istrosenosti lezista teskovodne pumpe Avala

Abstract

After dismantling of the CEN-132 pump the findings of the Commission were: the wear-out of the surfaces of the pump bearings and one disc caused appearance of about 39 grams of cobalt in the heavy water system of the reactor. This report includes: results of chemical analysis of stellite taken form pump disc, results of measuring the wear-out of the upper pump bearing, drawing of the worn-out disc and upper cladding of the pump, and a photo of the upper surface of the disc. [Serbo-Croat] Posle demontaze pumpe CEN-132, pregleda detalja i izvrsenih merenja komisija je konstatovala da je zbog istrosenosti lezista diska pumpe i istrosenosti gornje caure u teskovodni sistem dospelo ukupno 39 grama kobalta. Ovaj dokument sadrzi i rezultate hemijske analize stelita skinutog sa diska pumpe, rezultate merenja istrosenosti gornjeg lezista teskovodne pumpe, crteze istrosnog diska skinutog sa pumpe, crteze gornje caure, fotografiju gornje povrsine diska.
Authors:
Nikolic, M; Bratic, A; Zaric, Z; Vidmar, M; Kirilin, J [1] 
  1. Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Publication Date:
Dec 15, 1963
Product Type:
Technical Report
Report Number:
INIS-CS-0096; RA-214/R3/P3/56/01
Resource Relation:
Other Information: 2 tabs, 6 figs; 6 tabs, 6 figs, 7 refs; Related Information: In: Heavy water pumps, Pumpe D{sub 2}O, by Zecevic, V.; Nikolic, M, 149 pages.
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; BEARINGS; COBALT; HEAVY WATER; PUMPS; R-A REACTOR; REACTOR COOLING SYSTEMS; STELLITE
OSTI ID:
20743607
Research Organizations:
Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Country of Origin:
Serbia and Montenegro
Language:
English
Other Identifying Numbers:
TRN: CS06RA457052907
Availability:
Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca
Submitting Site:
INIS
Size:
page(s) 17
Announcement Date:
Jun 28, 2006

Citation Formats

Nikolic, M, Bratic, A, Zaric, Z, Vidmar, M, and Kirilin, J. Conclusion of the commission for determining wear out of Avala heavy water pump bearings - Annex 1; Prilog1 - Zakljucak komisije za utvrdjivanje istrosenosti lezista teskovodne pumpe Avala. Serbia and Montenegro: N. p., 1963. Web.
Nikolic, M, Bratic, A, Zaric, Z, Vidmar, M, & Kirilin, J. Conclusion of the commission for determining wear out of Avala heavy water pump bearings - Annex 1; Prilog1 - Zakljucak komisije za utvrdjivanje istrosenosti lezista teskovodne pumpe Avala. Serbia and Montenegro.
Nikolic, M, Bratic, A, Zaric, Z, Vidmar, M, and Kirilin, J. 1963. "Conclusion of the commission for determining wear out of Avala heavy water pump bearings - Annex 1; Prilog1 - Zakljucak komisije za utvrdjivanje istrosenosti lezista teskovodne pumpe Avala." Serbia and Montenegro.
@misc{etde_20743607,
title = {Conclusion of the commission for determining wear out of Avala heavy water pump bearings - Annex 1; Prilog1 - Zakljucak komisije za utvrdjivanje istrosenosti lezista teskovodne pumpe Avala}
author = {Nikolic, M, Bratic, A, Zaric, Z, Vidmar, M, and Kirilin, J}
abstractNote = {After dismantling of the CEN-132 pump the findings of the Commission were: the wear-out of the surfaces of the pump bearings and one disc caused appearance of about 39 grams of cobalt in the heavy water system of the reactor. This report includes: results of chemical analysis of stellite taken form pump disc, results of measuring the wear-out of the upper pump bearing, drawing of the worn-out disc and upper cladding of the pump, and a photo of the upper surface of the disc. [Serbo-Croat] Posle demontaze pumpe CEN-132, pregleda detalja i izvrsenih merenja komisija je konstatovala da je zbog istrosenosti lezista diska pumpe i istrosenosti gornje caure u teskovodni sistem dospelo ukupno 39 grama kobalta. Ovaj dokument sadrzi i rezultate hemijske analize stelita skinutog sa diska pumpe, rezultate merenja istrosenosti gornjeg lezista teskovodne pumpe, crteze istrosnog diska skinutog sa pumpe, crteze gornje caure, fotografiju gornje povrsine diska.}
place = {Serbia and Montenegro}
year = {1963}
month = {Dec}
}