Abstract
Developed within the framework of the UTE (INITEC-INYPSA-Empresarios Agrupados), the Probabilistic Safety Analysis (PSA) of the Asco Nuclear Power Plant has served both as a basic tool in reducing the risk of potential internal flooding at the plant, and as a guideline for studying the optimization and feasibility of necessary plant design modifications and changes to procedures. During execution of the work, and in view of the results, a series of improvements were proposed which gave rise to design modification studies. The paper seeks to describe the effect of these modifications on reducing core damage frequency, it also includes a general description of the methodology used. Finally, it compares the results obtained in the context of similar studies performed in other PSAs. (author)
Nos Llorens, V;
[1]
Faig Sureda, J
[2]
- Empresarios Agrupados, A.I.E., Madrid (Spain)
- Asociacion Nuclear ASCO, Barcelona (Spain)
Citation Formats
Nos Llorens, V, and Faig Sureda, J.
Flooding risk reduction for the ASCO NPP PSA; Reduccion del riesgo por inundaciones en el APS de C.N. ASCO.
IAEA: N. p.,
1993.
Web.
Nos Llorens, V, & Faig Sureda, J.
Flooding risk reduction for the ASCO NPP PSA; Reduccion del riesgo por inundaciones en el APS de C.N. ASCO.
IAEA.
Nos Llorens, V, and Faig Sureda, J.
1993.
"Flooding risk reduction for the ASCO NPP PSA; Reduccion del riesgo por inundaciones en el APS de C.N. ASCO."
IAEA.
@misc{etde_20740503,
title = {Flooding risk reduction for the ASCO NPP PSA; Reduccion del riesgo por inundaciones en el APS de C.N. ASCO}
author = {Nos Llorens, V, and Faig Sureda, J}
abstractNote = {Developed within the framework of the UTE (INITEC-INYPSA-Empresarios Agrupados), the Probabilistic Safety Analysis (PSA) of the Asco Nuclear Power Plant has served both as a basic tool in reducing the risk of potential internal flooding at the plant, and as a guideline for studying the optimization and feasibility of necessary plant design modifications and changes to procedures. During execution of the work, and in view of the results, a series of improvements were proposed which gave rise to design modification studies. The paper seeks to describe the effect of these modifications on reducing core damage frequency, it also includes a general description of the methodology used. Finally, it compares the results obtained in the context of similar studies performed in other PSAs. (author)}
place = {IAEA}
year = {1993}
month = {Dec}
}
title = {Flooding risk reduction for the ASCO NPP PSA; Reduccion del riesgo por inundaciones en el APS de C.N. ASCO}
author = {Nos Llorens, V, and Faig Sureda, J}
abstractNote = {Developed within the framework of the UTE (INITEC-INYPSA-Empresarios Agrupados), the Probabilistic Safety Analysis (PSA) of the Asco Nuclear Power Plant has served both as a basic tool in reducing the risk of potential internal flooding at the plant, and as a guideline for studying the optimization and feasibility of necessary plant design modifications and changes to procedures. During execution of the work, and in view of the results, a series of improvements were proposed which gave rise to design modification studies. The paper seeks to describe the effect of these modifications on reducing core damage frequency, it also includes a general description of the methodology used. Finally, it compares the results obtained in the context of similar studies performed in other PSAs. (author)}
place = {IAEA}
year = {1993}
month = {Dec}
}