Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1976. godini

Abstract

During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of  More>>
Authors:
Martinc, R [1] 
  1. Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Publication Date:
Dec 15, 1976
Product Type:
Miscellaneous
Report Number:
INIS-CS-0061; RA-214/R3/P3/37
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; FUEL CHANNELS; HIGHLY ENRICHED URANIUM; LEADING ABSTRACT; LICENSING PROCEDURES; R-A REACTOR; REACTOR COOLING SYSTEMS; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR VESSELS
OSTI ID:
20734969
Country of Origin:
Serbia and Montenegro
Language:
English
Other Identifying Numbers:
TRN: CS06RA372045390
Availability:
Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca
Submitting Site:
INIS
Size:
253 pages
Announcement Date:
Jun 19, 2006

Citation Formats

Martinc, R. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1976. godini. Serbia and Montenegro: N. p., 1976. Web.
Martinc, R. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1976. godini. Serbia and Montenegro.
Martinc, R. 1976. "Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1976. godini." Serbia and Montenegro.
@misc{etde_20734969,
title = {Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1976. godini}
author = {Martinc, R}
abstractNote = {During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation. [Serbo-Croat] Reaktor RA je u 1976. godini radio za oko 30% krace vreme od uobicajenog. Razlog su bill izuzetno veliki obim remontnih i drugih radova u okviru tekuceg i investicionog odrzavanja, kao i krupnih remonta do kojih je dolazilo zbog kvarova (nastalih zbog neizvrsavanja investicionog odrzavanja u toku poslednjih 6 godina) zatim nemogucnost ranijeg pocetka koriscenja novog goriva u reaktoru RA i istrosenosti rezervi starog 2% obogacenog goriva i na kraju zbog obimnog programa eksperimenata u oblasti sigurnosnih analiza vezanih za uvodjenje novog visokoobogacenog goriva u reaktor RA. Na reaktoru RA uspesno su izvrseni eksperimentalni i teorijski radovi u oblasti sigurnosnih analiza za prevodjenje reaktora RA na novo 80% obogaceno gorivo, krunisani eksperimentalnom kampanjom reaktora RA u decembru 1976, kojom se zavrsava 17-to godisnji period koriscenja 2% obogacenog goriva i otpocinje period koriscenja novog 80% obogacenog goriva u reaktoru RA. Ovaj uspeh je od izuzetnog znacaja za reaktor RA i njegove korisnike, jer ce rezultovati u povecanju osnovne proizvodnje neutronskog fluksa od 50%, pri porastu cene kostanja rada reaktora od oko 4%. Podnet je zahtev za konacno odobrenje prelaznog rezima za uvodjenje ovog goriva, kojim se postize usteda od najmanje 2 200 000 dinara. Ovim se obezbedjuje da u 1977. godini i dalje, rad reaktora ne bude vise ometan ''kriticnim'' ili drugim eksperimentima u vezi sa uvodjenjem novog goriva u reaktor. Izvrsen je obiman program remontnih i drugih radova veoma akutne prirode, koji takodje omogucuju nesmetan rad u 1977. godini. Neki od ovih radova nisu radjeni nikad ranije, a drugi nisu radjeni u proteklih 6 godina. Najzacajniji zahvati ove vrste bili su: nabavka Al-cevi od specijalne legure, izrada i montiranje tehnoloskoh kanala; obimno ispitivanje uzroka curenja spoljasnjeg suda; remont teskovodne pumpe; zamena dva vertikalna tehnoloska kanala. Nabavljena je osnovna oprema za izgradnju sistema za hladjenje u slucaju udesa. Izvrseno je opremanje vrucih komora reaktora RA.}
place = {Serbia and Montenegro}
year = {1976}
month = {Dec}
}