Operation and maintenance of the RA nuclear reactor for 1977, Report Annex I; Rad i iskoriscenost reaktora RA u 1977. godini, izvestaj Prilog I

Abstract

RA reactor operation plan was fulfilled, meaning 28583 MWh. In addition to 183 days of operation at full power, during 1977 the reactor was operated for 14 days at lower power level according to the demand of users. The utilization level of rector irradiation capability (neutron flux and time of operation) was 14%. This annex includes detailed statistical data about reactor operation, utilization, power level, savings concerned with new 80% enriched fuel. All the 9 vertical experimental channels were used for irradiation in the reactor core. Digression from the action plan were caused by refueling and demand od the users. There have been 11 safety shutdowns, of which 6 caused by power cuts, 4 due to failure of the instruments, and 1 due to earthquake in March 1977. [Serbo-Croat] Planirani rad reaktora na nominalnoj snazi ostvaren je u iznosu od 28583 MWh. U toku 1977. godine reaktor je radio 14 dana na manjim snagama i u posebnom eksperimentalnom rezimu na zahtev korisnika. Iskoriscenost kapaciteta reaktora za ozracivanje uzoraka (na bazi neutronskog fluksa i vremena rada reaktora) bila je 41%. Ovaj izvestaj sadrzi detaljne statisticke podatke o radu i iskoriscenosti reaktora, podatke o ustedi goriva prelaskom na 80% obogaceno gorivo. Korisceno  More>>
Authors:
Martinc, R; Stanic, A [1] 
  1. Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Publication Date:
Dec 15, 1977
Product Type:
Technical Report
Report Number:
INIS-CS-0040; RA-103/R1/P2/04/01
Resource Relation:
Other Information: 10 tabs, 17 refs; Related Information: In: Operation and maintenance of RA Reactor, Annual report 1977, Pogon i odrzavanje reaktora RA - Izvestaj o radu u 1977. godini, by Milosevic, M. et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)], 92 pages.
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; AVAILABILITY; ELECTRICAL FAULTS; HIGHLY ENRICHED URANIUM; R-A REACTOR; REACTOR EXPERIMENTAL FACILITIES; REACTOR INSTRUMENTATION; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR SAFETY; REACTOR SHUTDOWN; SCRAM
OSTI ID:
20723445
Research Organizations:
Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Country of Origin:
Serbia and Montenegro
Language:
English
Other Identifying Numbers:
TRN: CS06RA255035968
Availability:
Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca
Submitting Site:
INIS
Size:
page(s) 24
Announcement Date:
May 15, 2006

Citation Formats

Martinc, R, and Stanic, A. Operation and maintenance of the RA nuclear reactor for 1977, Report Annex I; Rad i iskoriscenost reaktora RA u 1977. godini, izvestaj Prilog I. Serbia and Montenegro: N. p., 1977. Web.
Martinc, R, & Stanic, A. Operation and maintenance of the RA nuclear reactor for 1977, Report Annex I; Rad i iskoriscenost reaktora RA u 1977. godini, izvestaj Prilog I. Serbia and Montenegro.
Martinc, R, and Stanic, A. 1977. "Operation and maintenance of the RA nuclear reactor for 1977, Report Annex I; Rad i iskoriscenost reaktora RA u 1977. godini, izvestaj Prilog I." Serbia and Montenegro.
@misc{etde_20723445,
title = {Operation and maintenance of the RA nuclear reactor for 1977, Report Annex I; Rad i iskoriscenost reaktora RA u 1977. godini, izvestaj Prilog I}
author = {Martinc, R, and Stanic, A}
abstractNote = {RA reactor operation plan was fulfilled, meaning 28583 MWh. In addition to 183 days of operation at full power, during 1977 the reactor was operated for 14 days at lower power level according to the demand of users. The utilization level of rector irradiation capability (neutron flux and time of operation) was 14%. This annex includes detailed statistical data about reactor operation, utilization, power level, savings concerned with new 80% enriched fuel. All the 9 vertical experimental channels were used for irradiation in the reactor core. Digression from the action plan were caused by refueling and demand od the users. There have been 11 safety shutdowns, of which 6 caused by power cuts, 4 due to failure of the instruments, and 1 due to earthquake in March 1977. [Serbo-Croat] Planirani rad reaktora na nominalnoj snazi ostvaren je u iznosu od 28583 MWh. U toku 1977. godine reaktor je radio 14 dana na manjim snagama i u posebnom eksperimentalnom rezimu na zahtev korisnika. Iskoriscenost kapaciteta reaktora za ozracivanje uzoraka (na bazi neutronskog fluksa i vremena rada reaktora) bila je 41%. Ovaj izvestaj sadrzi detaljne statisticke podatke o radu i iskoriscenosti reaktora, podatke o ustedi goriva prelaskom na 80% obogaceno gorivo. Korisceno je svih 9 vertikalnih eksperimentalnih kanala u aktivnoj zoni. Uzroci odstupanja od plana rada osim zamene goriva bili su zahtevi korisnika. Bilo je 11 sigurnosnih zaustavljanja, 6 usled nestanka napona, 4 usled kvarova opreme i instrumentacije, i 1 put usled zemljotresa u martu.}
place = {Serbia and Montenegro}
year = {1977}
month = {Dec}
}