RA Research reactor, Annual report 1969; Istrazivacki nuklearni reaktor RA - Izvestaj za 1969. godinu - Pogon i odrzavanje

Abstract

During 1969, the RA Reactor was operated at nominal power of 6.5 MW for 200 days, and 15 days at lower power levels. Total production mounted to 31131 MWh which is 3.77% higher than planned. Reactor was used for irradiation and experiments according to the demand of 463 users from the Institute and 63 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. If there had been no problems with power supply during last three months and Danube low water level in September and October the past year would have been the most successful up to now. The number od scram shutdowns was not higher than during past two years in spite of the difficulties in the last quarter. There were three incidents which caused higher personnel exposure during operation. One, was the destruction of the canner with silver (because the time spent in the core was too long) which caused the surface contamination of the platform, the background radiation was 10 to 100 times higher than regular. The other two cases were caused by failure of the device for handling the  More>>
Authors:
Milosevic, D et al. [1] 
  1. Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Publication Date:
Dec 15, 1969
Product Type:
Miscellaneous
Report Number:
INIS-CS-0034; RA-214/R5/P3/29
Resource Relation:
Other Information: 35 tabs
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; DECONTAMINATION; FINANCING; OCCUPATIONAL EXPOSURE; POWER DENSITY; R-A REACTOR; RADIATION PROTECTION; REACTOR COMPONENTS; REACTOR EXPERIMENTAL FACILITIES; REACTOR FUELING; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR SHUTDOWN; SCRAM; SURFACE CONTAMINATION
OSTI ID:
20719934
Research Organizations:
Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Country of Origin:
Serbia and Montenegro
Language:
English
Other Identifying Numbers:
TRN: CS06RA248032197
Availability:
Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca
Submitting Site:
INIS
Size:
76 pages
Announcement Date:
May 30, 2006

Citation Formats

Milosevic, D et al. RA Research reactor, Annual report 1969; Istrazivacki nuklearni reaktor RA - Izvestaj za 1969. godinu - Pogon i odrzavanje. Serbia and Montenegro: N. p., 1969. Web.
Milosevic, D et al. RA Research reactor, Annual report 1969; Istrazivacki nuklearni reaktor RA - Izvestaj za 1969. godinu - Pogon i odrzavanje. Serbia and Montenegro.
Milosevic, D et al. 1969. "RA Research reactor, Annual report 1969; Istrazivacki nuklearni reaktor RA - Izvestaj za 1969. godinu - Pogon i odrzavanje." Serbia and Montenegro.
@misc{etde_20719934,
title = {RA Research reactor, Annual report 1969; Istrazivacki nuklearni reaktor RA - Izvestaj za 1969. godinu - Pogon i odrzavanje}
author = {Milosevic, D et al.}
abstractNote = {During 1969, the RA Reactor was operated at nominal power of 6.5 MW for 200 days, and 15 days at lower power levels. Total production mounted to 31131 MWh which is 3.77% higher than planned. Reactor was used for irradiation and experiments according to the demand of 463 users from the Institute and 63 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. If there had been no problems with power supply during last three months and Danube low water level in September and October the past year would have been the most successful up to now. The number od scram shutdowns was not higher than during past two years in spite of the difficulties in the last quarter. There were three incidents which caused higher personnel exposure during operation. One, was the destruction of the canner with silver (because the time spent in the core was too long) which caused the surface contamination of the platform, the background radiation was 10 to 100 times higher than regular. The other two cases were caused by failure of the device for handling the fuel slugs in the fuel channels during refuelling. Reactor refuelling was done four times during 1969, and 499 fresh fuel slugs were used. Refuelling applied the approach of 'mixing' the fresh fuel slugs with the 'old' fuel slugs in the fuel channel. Decontamination of surfaces was on the same level as previously in spite of the problems with silver. Since two staff members have left, the present number od employees is now the minimum needed for reactor operation and maintenance. It is stated that the operation of components and equipment is on sufficiently high level after ten years of reactor operation. The action plan for 1970 is made according to the same principles as in previous four years but the planned production is decreased to 25000 MWh, because control of important components is needed after ten years of operation as well as purification of heavy water. [Serbo-Croat] Reaktor RA je u 1969. godini radio na nominalnoj snazi 200 dana i 15 dana na manjim snagama. Ukupni rad iznosio je 31131 MWh odnosno 3.77% vise od planiranog. Reaktor je koriscen za ozracivanja i eksperimenta prema zahtevima 463 korisnika iz Instituta i 63 izvan Instituta. Ovaj izvestak sadrzi detaljne podatke o snazi na kojoj je reaktor radio tokom 1969. godine i o uradjenim eksperimentima. Zakljuceno je da je reaktor RA uspesno radio prema planu rada. Da nije bilo problema sa napajanjem elektricnom energijom tokom poslednja tri meseca i niskog vodostaja Dunava u septembru i oktobru protekle godine bila bi to najuspesnija godina od pustanja reaktora u pogon. Broj sigurnosnih zaustavljanja nije bio veci u odnosu na prethodne dve godine i pored poteskoca u poslednjem kvartalu. Osoblje je bilo izlozeno povecanim dozama zracenja usled tri incidenta. Jedan je bio raspadanje kenera sa srebrom (zbog duzeg stajanja u aktivnoj zoni), sto je uzrokovalo kontaminaciju radne platforme, tako da je fon porastao za 10 do 100 puta od normalnohg Druga dva slucaja su bila otkazivanje uredjaja za mesanje goriva u tehnoloskim kanalima. Zamena goriva je radjena cetiri puta u toku godine, utroseno je 499 svezih gorivnih elemenata. Primenjena je metoda mesanja svezih gorivnih elemenata sa koriscenim gorivnim elementima u gorivnom kanalu. Dekontaminacija povrsina bila je na nivou prethodnih godina i pored problema sa srebrom. Kako su sa reaktora tokom godine otisla dva saradnika sa visokom spremom broj ljudi je opao na neophodan minimum za pogon i odrzavanje reaktora. Navrsavajuci u ovoj godini deset godina rada moze se reci da su rad i stanje opreme na tehnicki solidnom nivou. Kako bi se posle deset godina rada izvrsila kontrola vaznih komponenti reaktora i obavila rekoncentracija teske vode, za 1970. godinu je planirano da se proizvodnja smanji na 25000 MWh, a baziran je na istim principima kao i planovi za prethodne cetiri godine.}
place = {Serbia and Montenegro}
year = {1969}
month = {Dec}
}