RA Research reactor, Annual report 1971; Istrazivacki nuklearni reaktor RA - Izvestaj za 1971. godinu - Pogon i odrzavanje

Abstract

During 1971, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and 50 days at lower power levels. Total production mounted to 31606 MWh which is 5.3% higher than planned, and the highest annual level since the reactor started operation. Reactor was used for irradiation and experiments according to the demand of 425 users, of which 370 from the Institute and 55 external users. This report contains detailed data about reactor power and experiments performed in 1971. Discrepancies from the action plan, meaning higher production was achieved in June and December due to special demand of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to power cuts during reactor operation. There was no longer interruption caused by failures of the equipment. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. Shorter interruptions resulted from breaking of connectors in the technical water pipe system caused by soil sliding near the pumping station on the Danube. Total personnel exposure dose was lower than during previous years. There was no accident nor any event that could be  More>>
Authors:
Milosevic, D et al. [1] 
  1. Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Publication Date:
Dec 15, 1971
Product Type:
Miscellaneous
Report Number:
INIS-CS-0037; RA-214/R5/P3/32
Resource Relation:
Other Information: 36 tabs, 4 figs
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; ELECTRONIC EQUIPMENT; FINANCING; NEUTRON FLUX; R-A REACTOR; RADIATION PROTECTION; REACTOR COMPONENTS; REACTOR CONTROL SYSTEMS; REACTOR EXPERIMENTAL FACILITIES; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR SAFETY; SECONDARY COOLANT CIRCUITS
OSTI ID:
20714205
Research Organizations:
Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Country of Origin:
Serbia and Montenegro
Language:
English
Other Identifying Numbers:
TRN: CS06RA251028302
Availability:
Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca
Submitting Site:
INIS
Size:
75 pages
Announcement Date:
May 30, 2006

Citation Formats

Milosevic, D et al. RA Research reactor, Annual report 1971; Istrazivacki nuklearni reaktor RA - Izvestaj za 1971. godinu - Pogon i odrzavanje. Serbia and Montenegro: N. p., 1971. Web.
Milosevic, D et al. RA Research reactor, Annual report 1971; Istrazivacki nuklearni reaktor RA - Izvestaj za 1971. godinu - Pogon i odrzavanje. Serbia and Montenegro.
Milosevic, D et al. 1971. "RA Research reactor, Annual report 1971; Istrazivacki nuklearni reaktor RA - Izvestaj za 1971. godinu - Pogon i odrzavanje." Serbia and Montenegro.
@misc{etde_20714205,
title = {RA Research reactor, Annual report 1971; Istrazivacki nuklearni reaktor RA - Izvestaj za 1971. godinu - Pogon i odrzavanje}
author = {Milosevic, D et al.}
abstractNote = {During 1971, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and 50 days at lower power levels. Total production mounted to 31606 MWh which is 5.3% higher than planned, and the highest annual level since the reactor started operation. Reactor was used for irradiation and experiments according to the demand of 425 users, of which 370 from the Institute and 55 external users. This report contains detailed data about reactor power and experiments performed in 1971. Discrepancies from the action plan, meaning higher production was achieved in June and December due to special demand of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to power cuts during reactor operation. There was no longer interruption caused by failures of the equipment. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. Shorter interruptions resulted from breaking of connectors in the technical water pipe system caused by soil sliding near the pumping station on the Danube. Total personnel exposure dose was lower than during previous years. There was no accident nor any event that could be called accidental. Decontamination od surfaces was less than during previous years. It was concluded that the successful operation in 1971 resulted from efficient work during past years. But, some of the activities were interrupted due to undefined policy concerned with operation of the RA reactor and financial issues. This involves study of the possibility to use highly enriched fuel that would increase the useful neutron flux and the reactor compatibility with similar reactors for the future ten years. Another project that has been interrupted is construction of the emergency core cooling system which is important for the reactor safety. Financial problems have influenced not only the reactor operation but the number of employees, which could cause negative effects. In the introduction of this report it has been emphasised that the decision makers should have in mind the negative effects of low budget on the reactor safe and reliable operation. For the sake of reactor, decision about the future operation and financing should be done as soon as possible, either to cease operation or continue with adequate financial support. [Serbo-Croat] Reaktor RA je u 1971. godini radio na nominalnoj snazi 190 dana i 50 dana na manjim snagama. Ukupni rad iznosio je 31606 MWh odnosno 5,3% vise od planiranog, sto je najvisa vrednost od kako je reaktor pusten u rad. Reaktor je koriscen za ozracivanja i eksperimente za 425 korisnika od cega 370 iz Instituta i 55 za korisnika izvan Instituta. Ovaj izvestaj sadrzi detaljne podatke o radu i eksperimentima koji su obavljani. Odstupanja od plana, odnosno veceg ostvarenog rada bilo je u junu i decembru usled posebnih zahteva korisnika. Ukupni broj prekida rada bio je manji od svih prethodnih godina, uglavnom zbog manjeg broja nestanka napona u vreme rada reaktora. U toku godine bilo je samo jedno sigurnosno zaustavljanje, ciji je uzrok bila pojava laznog signala opreme za zastitu reaktora. Nijednog duzeg prekida rada nije bilo zbog neispravnosti opreme. Kracih prekida bilo je usled kidanja spojki na potisnom cevovodu tehnicke vode, sto je bilo izazvano klizanjem zemljista u podrucju crpne stanice na Dunavu. Ukupna doza ozracivanja ljudstva bila je manja nego prethodnih godina. Nije bilo ni jednog akcidenta niti slucaja koji bi se mogao nazvati akcidentom. Dekontaminirano je znatno manje povrsina nego ranijih godina. Zakljuceno je da je uspesan rad reaktora u 1971. godini rezultat valjanog rada u prethodnim godinama. Medjutim usled jos nedefinisane politike u pogledu buduceg rada, odnosno neizvesnosti u vezi finansiranja, neki poslovi su obustavljeni. Tu spada proucavanje mogucnosti prelaska na koriscenje visokoobogacenog goriva sto bi povecalo korisni neutronski fluks i ucinilo reakor konkurentnim za sledecih deset godina, i realizacija projekta sistema za udesno hladjenje sto je znacajno za sigurnost reaktora. Finansijski problemi odrazavaju se ne samo na rad reaktora nego i na broj zaposlenih sto moze imati stetne posledice. U uvodu ovog izvestaja naglaseno je da bi oni koji odlucuju o finansiranju reaktora RA trebalo da imaju na umu da bez neophodnih sredstva nije moguc bezbedan i siguran rad, sto bi moglo imati stetnih posledica, pa bi sto pre trebalo doneti odluku: ili ce reaktor prestati da radi, ili ce i dalje raditi i biti finansiran. Za reaktor bi bilo dobro ukoliko bi ovakva odluka bila doneta sto pre.}
place = {Serbia and Montenegro}
year = {1971}
month = {Dec}
}