RA Research reactor, Annual report 1972; Istrazivacki nuklearni reaktor RA - Izvestaj za 1972. godinu - Pogon i odrzavanje

Abstract

During 1972, the total production was 31151 MWh which is 3.8% higher than planned. The reactor was used for irradiation and experiments according to the demand of 381 users, of which 340 from the Institute and 41 external users. This report contains detailed data about reactor power and experiments performed in 1972. Discrepancies from the action plan, meaning higher production was achieved due to special demands of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to announced power cuts. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. There were no longer interruptions. One shorter interruption (shorter than 24 hours) caused by removal of a UO{sub 2} capsule from the core, placed there for measuring heat transfer. Total personnel exposure dose was lower than during previous years. One accident caused contamination with gases and aerosols containing mainly shot-living isotopes. Decontamination od surfaces was less than during previous years. Practically there was no surface contamination that would demand action of the decontamination team, except for the regular decontamination after refueling. It was concluded that the successful operation in 1972 has  More>>
Authors:
Milosevic, D et al. [1] 
  1. Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Publication Date:
Dec 15, 1972
Product Type:
Miscellaneous
Report Number:
INIS-CS-0038; RA-214/R5/P3/33
Resource Relation:
Other Information: 36 tabs
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; DECONTAMINATION; ECCS; FINANCING; HIGHLY ENRICHED URANIUM; POWER DENSITY; POWER SUPPLIES; R-A REACTOR; RADIATION PROTECTION; REACTOR COMPONENTS; REACTOR EXPERIMENTAL FACILITIES; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR SAFETY; REACTOR SHUTDOWN
OSTI ID:
20711852
Research Organizations:
Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Country of Origin:
Serbia and Montenegro
Language:
English
Other Identifying Numbers:
TRN: CS06RA252026228
Availability:
Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca
Submitting Site:
INIS
Size:
84 pages
Announcement Date:
May 08, 2006

Citation Formats

Milosevic, D et al. RA Research reactor, Annual report 1972; Istrazivacki nuklearni reaktor RA - Izvestaj za 1972. godinu - Pogon i odrzavanje. Serbia and Montenegro: N. p., 1972. Web.
Milosevic, D et al. RA Research reactor, Annual report 1972; Istrazivacki nuklearni reaktor RA - Izvestaj za 1972. godinu - Pogon i odrzavanje. Serbia and Montenegro.
Milosevic, D et al. 1972. "RA Research reactor, Annual report 1972; Istrazivacki nuklearni reaktor RA - Izvestaj za 1972. godinu - Pogon i odrzavanje." Serbia and Montenegro.
@misc{etde_20711852,
title = {RA Research reactor, Annual report 1972; Istrazivacki nuklearni reaktor RA - Izvestaj za 1972. godinu - Pogon i odrzavanje}
author = {Milosevic, D et al.}
abstractNote = {During 1972, the total production was 31151 MWh which is 3.8% higher than planned. The reactor was used for irradiation and experiments according to the demand of 381 users, of which 340 from the Institute and 41 external users. This report contains detailed data about reactor power and experiments performed in 1972. Discrepancies from the action plan, meaning higher production was achieved due to special demands of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to announced power cuts. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. There were no longer interruptions. One shorter interruption (shorter than 24 hours) caused by removal of a UO{sub 2} capsule from the core, placed there for measuring heat transfer. Total personnel exposure dose was lower than during previous years. One accident caused contamination with gases and aerosols containing mainly shot-living isotopes. Decontamination od surfaces was less than during previous years. Practically there was no surface contamination that would demand action of the decontamination team, except for the regular decontamination after refueling. It was concluded that the successful operation in 1972 has a special significance having taking in account the financial crisis caused by the unresolved status of the reactor. It is emphasised, in the plan for the next year that there is an urgent need of making a long-term plan of rector application. It is indispensable to finish preparatory tasks for replacing the fuel with the highly enriched fuel elements by 1974, and building the core emergency cooling system. [Serbo-Croat] Ukupni rad Reaktora RA je u 1972. godini iznosio je 31151 MWh odnosno 3,8% vise od planiranog. Reaktor je koriscen za ozracivanja i eksperimente za 381 korisnika od cega 340 iz Instituta i 41 za korisnike izvan Instituta. Ovaj izvestaj sadrzi detaljne podatke o radu i eksperimentima koji su obavljani. Odstupanja od plana bilo je u maju usled posebnih zahteva korisnika. Ukupni broj prekida rada bio je manji je svih prethodnih godina, uglavnom zbog najavljenih prekida napajanja elekticnom energijom. U toku godine bilo je samo jedno sigurnosno zaustavljanje, ciji je uzrok bila pojava laznog signala opreme za zastitu reaktora. Nijednog duzeg prekida rada nije bilo. Kraci prekid rada (kraci od 24 sata) je bio usled vadjenja kapsule UO{sub 2}a koja je bila postavljena u jezgro radi merenja prelaza toplote. Ukupna doza ozracivanja ljudstva bila je manja nego prethodnih godina. Dogodio se jedan akcident kontaminacije gasovima i aerosolima i to kratkozivecim izotopima. Dekontaminirano je znatno manje povrsina nego ranijih godina. Prakticno i nije bilo kontaminacije povrsina koje bi zahtevale intervencije ekipe za dekontaminaciju osim standardnih dekontaminacija posle izmene goriva. Zakljuceno je da uspesan rad reaktora u 1972. godini ima poseban znacaj kada se ima na umu kriza finansiranja izazvana neblagovremenim resavanjem statusa reaktora. U planu za sledecu godinu naglasava se potreba pravljenja dugorocnog plana koriscenja reaktora. Neophodno je izvrsiti i pripreme za prelazak na rad sa visokoobogacenim gorivom u 1974. godini, kao i realizacija projekta sistema za udesno hladjenja jezgra u slucaju isticanja teske vode, odnosno sprecavanje maksimalnog moguceg akcidenta.}
place = {Serbia and Montenegro}
year = {1972}
month = {Dec}
}