You need JavaScript to view this

RA Research reactor, Annual report 1970 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1970. godinu - Pogon i odrzavanje

Abstract

During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with  More>>
Authors:
Milosevic, D et al. [1] 
  1. Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Publication Date:
Dec 15, 1970
Product Type:
Miscellaneous
Report Number:
INIS-CS-0036; RA-214/R5/P3/31
Resource Relation:
Other Information: 33 tabs
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; COOLANT LOOPS; HEAVY WATER; ISOTOPE RATIO; R-A REACTOR; RADIATION PROTECTION; REACTOR COMPONENTS; REACTOR CONTROL SYSTEMS; REACTOR EXPERIMENTAL FACILITIES; REACTOR MAINTENANCE; REACTOR OPERATION
OSTI ID:
20711851
Research Organizations:
Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)
Country of Origin:
Serbia and Montenegro
Language:
English
Other Identifying Numbers:
TRN: CS06RA250026227
Availability:
Available from INIS in electronic form; Also available from the Institute of nuclear sciences Vinca
Submitting Site:
INIS
Size:
86 pages
Announcement Date:
May 30, 2006

Citation Formats

Milosevic, D et al. RA Research reactor, Annual report 1970 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1970. godinu - Pogon i odrzavanje. Serbia and Montenegro: N. p., 1970. Web.
Milosevic, D et al. RA Research reactor, Annual report 1970 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1970. godinu - Pogon i odrzavanje. Serbia and Montenegro.
Milosevic, D et al. 1970. "RA Research reactor, Annual report 1970 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1970. godinu - Pogon i odrzavanje." Serbia and Montenegro.
@misc{etde_20711851,
title = {RA Research reactor, Annual report 1970 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1970. godinu - Pogon i odrzavanje}
author = {Milosevic, D et al.}
abstractNote = {During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in the pool. Refuelling was done three times by 'mixing' the irradiated fuel slugs with 5 to 6 fresh ones. Total exposure of the staff was increased due to activities during the shut-down period. Individual maximum exposure dose was not higher than 3.5 R. Cooperation with the French partner, concerned with the possibility of using 93% enriched fuel instead of the present low enriched, was continued. This would enable achievement of higher neutron flux, order of magnitude of 10{sup 14} n/cm{sup 2} sec. It is mentioned that there is doubt whether the plan for 1971 could be fulfilled for financial difficulties. [Serbo-Croat] Reaktor RA je u 1970. godini radio na nominalnoj snazi 160 dana i 40 dana na manjim snagama. Ukupni rad iznosio je 25968 MWh odnosno 3.87% vise od planiranog. Plan rada razlikovao se od prethodnih godina zbog slanja teske vode na rekoncentraciju u Francusku. Izotopski sastav teske vode je opao na 99.05% a posle rekoncentracije iznosi 99,96%. Odstupanje od plana rada u septembru mesecu bilo je izazvano kasnjenjem prispeca teske vode usled administrativnih teskoca i transporta. Pocetak kampanje odlozen je i zbog posledica ostecenja kosuljice jednog gorivnog elementa, sto se dogodilo odmah po pocetku rada pa je reaktor bio zaustavljen. U oktobru i novembru reaktor je radio 28 odnosno 25 dana respektivno sto je omogucilo da se nadoknadi izgubljeno vreme. Reaktor je koriscen za ozracivanja i eksperimente za 390 korisnika od cega 340 iz Instituta i 50 za korisnika izvan Instituta. Ovaj izvestaj sadrzi detaljne podatke o radu i eksperimentima koji su obavljani. Zakljucuje se da je reaktor radio uspesno prema planu rada. Kracih zastoja u radu bilo je samo zbog teskoca sa cevovodima tehnicke vode kao posledica klizanja zemljista. Reaktor je samo dva puta sigurnosno zaustavljan zbog neispravnosti opreme odnosno laznog signala elektronske aparature sistema upravljanja. Vreme dok reaktor nije radio iskorisceno je za inspekciju unutrasnjosti reaktorskog suda. Pomocu specijalnih televizijskih kamera i teleskopa ustanovljeno je da je unutrasnjost suda u odlicnom stanju, nisu uoceni nikakvi tragovi korozije. Istovremeno su napravljeni prikljucci na cevovodu teske vode u cilju realizacije projekta sistema za udesno hladjenje reaktorskog jezgra. Tokom 1970. godine isluzeno gorivo prepakovano je iz tahnoloskih kanala u specijalne sudove od aluminjuma. U bazen br. 4 odlozeno je 4 suda sa ukupno 660 elemenata, tako da se sada u bazenu nalazi 18 sudova sa 2951 gorivnim elementom. Izvrsene su tri izmene goriva i to mesanjem starog sa 5 ili 6 novih gorivnih elemenata. Poslovi u toku stajanja reaktora bili su skopcani cesto sa radom u polju visokog zracenja, sto je uzrokovalo vece totalne doze doze ozracivanja ljudstva. Maksimalna doza zracenja po coveku nije bila veca od 3,5 R. Nastavljena je saradnja sa francuskim partnerom na polju izucavanja mogucnosti koriscenja 93% obogacenog urana umesto sadasnjeg niskoobogacenog kako bi se postigao fluks reda velicine 10{sup 14} n/cm{sup 2} sec. Napominje se da je ostvarenje plana rada za 1971. godinu dovedeno u pitanje usled nedostatka finansijskih sredstava.}
place = {Serbia and Montenegro}
year = {1970}
month = {Dec}
}