The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963

Abstract

In this paper, the author attempts to sum up the conditions prevailing, after six years of operation, in the Laboratories of the Plutonium Extraction Plant. The origins and objectives are briefly reviewed, the technology and staff recruitment policy are examined, and progress made is shown. The methods used as well as the scope of application and limits imposed at the present state are considered. Past achievements and further possibilities in the next future are examined. An attempt has been made to bring out the outlooks for the more distant future and to investigate the conditions required for the successful carrying out of the program. (author) [French] Le present rapport tente, apres 6 ans de vie, de faire le point de la situation des Laboratoires du Service Extraction du Plutonium. Apres un rapide retour sur les origines et les objectifs, apres quelques considerations sur le recrutement et la technologie situant le contexte de leurs progres, nous etudierons les methodes, leurs domaines d'application, leurs limites actuelles. Nous ferons un bilan des realisations et des possibilites pour un avenir proche. Nous tenterons de degager quelques vues plus lointaines et les conditions pour les mener a bonne fin. (auteur)
Authors:
Fontaine, A [1] 
  1. CEA Marcoule, Centre de Production de Plutonium, 30 (France)
Publication Date:
Jul 01, 1964
Product Type:
Technical Report
Report Number:
CEA-R-2700
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; CEA MARCOULE; CONTROL; COUNTING TECHNIQUES; FUEL FABRICATION PLANTS; FUEL SOLUTIONS; GLOVEBOXES; HOT CELLS; MANIPULATORS; PERSONNEL; PLUTONIUM; PURIFICATION; RADIOACTIVITY; RADIOCHEMICAL ANALYSIS; SOLVENT EXTRACTION; SPECIFICATIONS
OSTI ID:
20668393
Research Organizations:
CEA Marcoule, Centre de Production de Plutonium, 30 (France)
Country of Origin:
France
Language:
French
Other Identifying Numbers:
TRN: FR05R2700107094
Availability:
Available from INIS in electronic form
Submitting Site:
FRN
Size:
65 pages
Announcement Date:
Dec 19, 2005

Citation Formats

Fontaine, A. The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963. France: N. p., 1964. Web.
Fontaine, A. The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963. France.
Fontaine, A. 1964. "The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963." France.
@misc{etde_20668393,
title = {The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963}
author = {Fontaine, A}
abstractNote = {In this paper, the author attempts to sum up the conditions prevailing, after six years of operation, in the Laboratories of the Plutonium Extraction Plant. The origins and objectives are briefly reviewed, the technology and staff recruitment policy are examined, and progress made is shown. The methods used as well as the scope of application and limits imposed at the present state are considered. Past achievements and further possibilities in the next future are examined. An attempt has been made to bring out the outlooks for the more distant future and to investigate the conditions required for the successful carrying out of the program. (author) [French] Le present rapport tente, apres 6 ans de vie, de faire le point de la situation des Laboratoires du Service Extraction du Plutonium. Apres un rapide retour sur les origines et les objectifs, apres quelques considerations sur le recrutement et la technologie situant le contexte de leurs progres, nous etudierons les methodes, leurs domaines d'application, leurs limites actuelles. Nous ferons un bilan des realisations et des possibilites pour un avenir proche. Nous tenterons de degager quelques vues plus lointaines et les conditions pour les mener a bonne fin. (auteur)}
place = {France}
year = {1964}