Abstract
In this paper, the author attempts to sum up the conditions prevailing, after six years of operation, in the Laboratories of the Plutonium Extraction Plant. The origins and objectives are briefly reviewed, the technology and staff recruitment policy are examined, and progress made is shown. The methods used as well as the scope of application and limits imposed at the present state are considered. Past achievements and further possibilities in the next future are examined. An attempt has been made to bring out the outlooks for the more distant future and to investigate the conditions required for the successful carrying out of the program. (author) [French] Le present rapport tente, apres 6 ans de vie, de faire le point de la situation des Laboratoires du Service Extraction du Plutonium. Apres un rapide retour sur les origines et les objectifs, apres quelques considerations sur le recrutement et la technologie situant le contexte de leurs progres, nous etudierons les methodes, leurs domaines d'application, leurs limites actuelles. Nous ferons un bilan des realisations et des possibilites pour un avenir proche. Nous tenterons de degager quelques vues plus lointaines et les conditions pour les mener a bonne fin. (auteur)
Fontaine, A
[1]
- CEA Marcoule, Centre de Production de Plutonium, 30 (France)
Citation Formats
Fontaine, A.
The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963.
France: N. p.,
1964.
Web.
Fontaine, A.
The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963.
France.
Fontaine, A.
1964.
"The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963."
France.
@misc{etde_20668393,
title = {The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963}
author = {Fontaine, A}
abstractNote = {In this paper, the author attempts to sum up the conditions prevailing, after six years of operation, in the Laboratories of the Plutonium Extraction Plant. The origins and objectives are briefly reviewed, the technology and staff recruitment policy are examined, and progress made is shown. The methods used as well as the scope of application and limits imposed at the present state are considered. Past achievements and further possibilities in the next future are examined. An attempt has been made to bring out the outlooks for the more distant future and to investigate the conditions required for the successful carrying out of the program. (author) [French] Le present rapport tente, apres 6 ans de vie, de faire le point de la situation des Laboratoires du Service Extraction du Plutonium. Apres un rapide retour sur les origines et les objectifs, apres quelques considerations sur le recrutement et la technologie situant le contexte de leurs progres, nous etudierons les methodes, leurs domaines d'application, leurs limites actuelles. Nous ferons un bilan des realisations et des possibilites pour un avenir proche. Nous tenterons de degager quelques vues plus lointaines et les conditions pour les mener a bonne fin. (auteur)}
place = {France}
year = {1964}
month = {Jul}
}
title = {The production control laboratories of the plutonium extraction Plant at Marcoule. Six years operating experience: 1957 - 1963; Les laboratoires de fabrication de l'usine d'extraction du plutonium de Marcoule. Experience des 6 premieres annees de fonctionnement: 1957 - 1963}
author = {Fontaine, A}
abstractNote = {In this paper, the author attempts to sum up the conditions prevailing, after six years of operation, in the Laboratories of the Plutonium Extraction Plant. The origins and objectives are briefly reviewed, the technology and staff recruitment policy are examined, and progress made is shown. The methods used as well as the scope of application and limits imposed at the present state are considered. Past achievements and further possibilities in the next future are examined. An attempt has been made to bring out the outlooks for the more distant future and to investigate the conditions required for the successful carrying out of the program. (author) [French] Le present rapport tente, apres 6 ans de vie, de faire le point de la situation des Laboratoires du Service Extraction du Plutonium. Apres un rapide retour sur les origines et les objectifs, apres quelques considerations sur le recrutement et la technologie situant le contexte de leurs progres, nous etudierons les methodes, leurs domaines d'application, leurs limites actuelles. Nous ferons un bilan des realisations et des possibilites pour un avenir proche. Nous tenterons de degager quelques vues plus lointaines et les conditions pour les mener a bonne fin. (auteur)}
place = {France}
year = {1964}
month = {Jul}
}