You need JavaScript to view this

Safety aspects of the FMPP (Fuel Manufacturing Pilot Plant) setup constructed by INVAP in the Arabic Republic of Egypt; Aspectos de seguridad en la puesta en marcha de la FMPP (Fuel Manufacturing Pilot Plant) construida por INVAP en la Republica Arabe de Egipto

Abstract

The FMPP is a fuel plates manufacturing plant for test reactors. This facility was designed, constructed in El Cairo and turned-key handled by INVAP SE to the Arabian Republic of Egypt. In this project, CNEA participated in the transference of technology, elaboration of documents, training of Egyptian personnel and technical services during the setup of the facility in El Cairo. These tasks were undertaken by UPMP (Uranium Powder Manufacturing Plant) and ECRI (Research Reactors Fuel Elements Plant) personnel. Both plants in CNEA served as a FMPP design basis. During the setup of the facility a fuel element with natural uranium was firstly manufactured and then another one using uranium with 20% enrichment. In this paper the responses of the system regarding safety, after finishing the first two stages of manufacturing, are analyzed and evaluated. (author)
Authors:
Cinat, Enrique; Boero, Norma L [1] 
  1. Comision Nacional de Energia Atomica, General San Martin (Argentina). Dept. de Combustibles Nucleares
Publication Date:
Jul 01, 1999
Product Type:
Conference
Report Number:
INIS-AR-C-203
Resource Relation:
Conference: AATN '99: 26. Annual meeting of the Argentine Association of Nuclear Technology (AANT), AATN '99: 26. Reunion anual de la Asociacion Argentina de Tecnologia Nuclear (AATN), San Carlos de Bariloche (Argentina), 9-12 Nov 1999; Other Information: PBD: 1999
Subject:
22 GENERAL STUDIES OF NUCLEAR REACTORS; FUEL ELEMENTS; FUEL FABRICATION PLANTS; SAFETY
OSTI ID:
20302841
Country of Origin:
Argentina
Language:
Spanish
Other Identifying Numbers:
TRN: AR02C0081064195
Availability:
Available from INIS in electronic form
Submitting Site:
INIS
Size:
7 pages
Announcement Date:
Dec 16, 2002

Citation Formats

Cinat, Enrique, and Boero, Norma L. Safety aspects of the FMPP (Fuel Manufacturing Pilot Plant) setup constructed by INVAP in the Arabic Republic of Egypt; Aspectos de seguridad en la puesta en marcha de la FMPP (Fuel Manufacturing Pilot Plant) construida por INVAP en la Republica Arabe de Egipto. Argentina: N. p., 1999. Web.
Cinat, Enrique, & Boero, Norma L. Safety aspects of the FMPP (Fuel Manufacturing Pilot Plant) setup constructed by INVAP in the Arabic Republic of Egypt; Aspectos de seguridad en la puesta en marcha de la FMPP (Fuel Manufacturing Pilot Plant) construida por INVAP en la Republica Arabe de Egipto. Argentina.
Cinat, Enrique, and Boero, Norma L. 1999. "Safety aspects of the FMPP (Fuel Manufacturing Pilot Plant) setup constructed by INVAP in the Arabic Republic of Egypt; Aspectos de seguridad en la puesta en marcha de la FMPP (Fuel Manufacturing Pilot Plant) construida por INVAP en la Republica Arabe de Egipto." Argentina.
@misc{etde_20302841,
title = {Safety aspects of the FMPP (Fuel Manufacturing Pilot Plant) setup constructed by INVAP in the Arabic Republic of Egypt; Aspectos de seguridad en la puesta en marcha de la FMPP (Fuel Manufacturing Pilot Plant) construida por INVAP en la Republica Arabe de Egipto}
author = {Cinat, Enrique, and Boero, Norma L}
abstractNote = {The FMPP is a fuel plates manufacturing plant for test reactors. This facility was designed, constructed in El Cairo and turned-key handled by INVAP SE to the Arabian Republic of Egypt. In this project, CNEA participated in the transference of technology, elaboration of documents, training of Egyptian personnel and technical services during the setup of the facility in El Cairo. These tasks were undertaken by UPMP (Uranium Powder Manufacturing Plant) and ECRI (Research Reactors Fuel Elements Plant) personnel. Both plants in CNEA served as a FMPP design basis. During the setup of the facility a fuel element with natural uranium was firstly manufactured and then another one using uranium with 20% enrichment. In this paper the responses of the system regarding safety, after finishing the first two stages of manufacturing, are analyzed and evaluated. (author)}
place = {Argentina}
year = {1999}
month = {Jul}
}