Abstract
Surveys and studies were conducted to establish a practical SNG (substitute natural gas) production process. For the development of an ARCH (advanced rapid coal hydrogasification) process, a plan was prepared covering the basic concept of the process, overall development program, hydrogen/oxygen burner, and an injector. The overall development program comprises element studies (4 years) and the study of the operation of a 50 tons/day pilot plant (8 years), and deals with the development of a reactor and peripheral equipment. Next comes a total system verification effort using a 200 tons/day verification plant in combination with a hydrogen production process, and this aims to achieve commercialization at 3 million Nm{sup 3}/day. As for the hydrogen/oxygen burner, a structure was proposed after surveys of literature and patents on burner structures, ignition methods, and monitoring methods. In the development of an injector, a plan was prepared for testing, and improving, the performance in a cold/hot model of a specimen incorporating the proposed hydrogen/oxygen burner. Basic studies to be carried out include simulation-aided performance prediction. (NEDO)
Citation Formats
None.
Fiscal 1994 survey report. Coal hydrogasification technology development; 1994 nendo sekitan suiten gaska gijutsu kaihatsu chosa hokokusho.
Japan: N. p.,
1995.
Web.
None.
Fiscal 1994 survey report. Coal hydrogasification technology development; 1994 nendo sekitan suiten gaska gijutsu kaihatsu chosa hokokusho.
Japan.
None.
1995.
"Fiscal 1994 survey report. Coal hydrogasification technology development; 1994 nendo sekitan suiten gaska gijutsu kaihatsu chosa hokokusho."
Japan.
@misc{etde_20291766,
title = {Fiscal 1994 survey report. Coal hydrogasification technology development; 1994 nendo sekitan suiten gaska gijutsu kaihatsu chosa hokokusho}
author = {None}
abstractNote = {Surveys and studies were conducted to establish a practical SNG (substitute natural gas) production process. For the development of an ARCH (advanced rapid coal hydrogasification) process, a plan was prepared covering the basic concept of the process, overall development program, hydrogen/oxygen burner, and an injector. The overall development program comprises element studies (4 years) and the study of the operation of a 50 tons/day pilot plant (8 years), and deals with the development of a reactor and peripheral equipment. Next comes a total system verification effort using a 200 tons/day verification plant in combination with a hydrogen production process, and this aims to achieve commercialization at 3 million Nm{sup 3}/day. As for the hydrogen/oxygen burner, a structure was proposed after surveys of literature and patents on burner structures, ignition methods, and monitoring methods. In the development of an injector, a plan was prepared for testing, and improving, the performance in a cold/hot model of a specimen incorporating the proposed hydrogen/oxygen burner. Basic studies to be carried out include simulation-aided performance prediction. (NEDO)}
place = {Japan}
year = {1995}
month = {Mar}
}
title = {Fiscal 1994 survey report. Coal hydrogasification technology development; 1994 nendo sekitan suiten gaska gijutsu kaihatsu chosa hokokusho}
author = {None}
abstractNote = {Surveys and studies were conducted to establish a practical SNG (substitute natural gas) production process. For the development of an ARCH (advanced rapid coal hydrogasification) process, a plan was prepared covering the basic concept of the process, overall development program, hydrogen/oxygen burner, and an injector. The overall development program comprises element studies (4 years) and the study of the operation of a 50 tons/day pilot plant (8 years), and deals with the development of a reactor and peripheral equipment. Next comes a total system verification effort using a 200 tons/day verification plant in combination with a hydrogen production process, and this aims to achieve commercialization at 3 million Nm{sup 3}/day. As for the hydrogen/oxygen burner, a structure was proposed after surveys of literature and patents on burner structures, ignition methods, and monitoring methods. In the development of an injector, a plan was prepared for testing, and improving, the performance in a cold/hot model of a specimen incorporating the proposed hydrogen/oxygen burner. Basic studies to be carried out include simulation-aided performance prediction. (NEDO)}
place = {Japan}
year = {1995}
month = {Mar}
}