Abstract
As a part of the project on the demonstration test on the methanol conversion at oil-fired power plant, feasibility study was made of a new system for methanol production by using abundant hydraulic power energy overseas and by combining water electrolysis and coal gasification technology, and the FY 1991 results were summarized. As a result of the survey, the following were selected as water electrolysis facilities: high efficiency/high current density/simplification system and solid polyelectrolyte electrolysis system with a high purity of hydrogen gas. As the coal gasifier, the oxygen blown furnace was selected which has a high carbon utilization factor, is able to gasify coal at high pressure, has no unnecessary N{sub 2}, and is being used in the integrated coal gasification combined cycle power system. As methanol synthesis facilities, the MGC/MHI method super converter was selected. Assuming the output of hydroelectric power generation to be 4,000MW, conceptual design of the optimum system was made. The methanol cost was estimated under the conditions written below: cost of hydroelectric power generation at site: 2-5 yen/kWh, coal unit price at site: 5,000-6,000 yen/t, transportation distance: 5,000-10,000 km. (NEDO)
Citation Formats
None.
FY 1991 report on the results of the demonstration test on the methanol conversion at oil-fired power plant. Feasibility study of a new system for the stabilized supply of fuel use methanol; 1991 nendo sekiyu karyoku hatsudensho metanoru tenkan tou jissho shiken. Nenryo you metanoru kyokyu antei ka no tameno shin system no kanosei chosa hokokusho.
Japan: N. p.,
1992.
Web.
None.
FY 1991 report on the results of the demonstration test on the methanol conversion at oil-fired power plant. Feasibility study of a new system for the stabilized supply of fuel use methanol; 1991 nendo sekiyu karyoku hatsudensho metanoru tenkan tou jissho shiken. Nenryo you metanoru kyokyu antei ka no tameno shin system no kanosei chosa hokokusho.
Japan.
None.
1992.
"FY 1991 report on the results of the demonstration test on the methanol conversion at oil-fired power plant. Feasibility study of a new system for the stabilized supply of fuel use methanol; 1991 nendo sekiyu karyoku hatsudensho metanoru tenkan tou jissho shiken. Nenryo you metanoru kyokyu antei ka no tameno shin system no kanosei chosa hokokusho."
Japan.
@misc{etde_20280978,
title = {FY 1991 report on the results of the demonstration test on the methanol conversion at oil-fired power plant. Feasibility study of a new system for the stabilized supply of fuel use methanol; 1991 nendo sekiyu karyoku hatsudensho metanoru tenkan tou jissho shiken. Nenryo you metanoru kyokyu antei ka no tameno shin system no kanosei chosa hokokusho}
author = {None}
abstractNote = {As a part of the project on the demonstration test on the methanol conversion at oil-fired power plant, feasibility study was made of a new system for methanol production by using abundant hydraulic power energy overseas and by combining water electrolysis and coal gasification technology, and the FY 1991 results were summarized. As a result of the survey, the following were selected as water electrolysis facilities: high efficiency/high current density/simplification system and solid polyelectrolyte electrolysis system with a high purity of hydrogen gas. As the coal gasifier, the oxygen blown furnace was selected which has a high carbon utilization factor, is able to gasify coal at high pressure, has no unnecessary N{sub 2}, and is being used in the integrated coal gasification combined cycle power system. As methanol synthesis facilities, the MGC/MHI method super converter was selected. Assuming the output of hydroelectric power generation to be 4,000MW, conceptual design of the optimum system was made. The methanol cost was estimated under the conditions written below: cost of hydroelectric power generation at site: 2-5 yen/kWh, coal unit price at site: 5,000-6,000 yen/t, transportation distance: 5,000-10,000 km. (NEDO)}
place = {Japan}
year = {1992}
month = {Mar}
}
title = {FY 1991 report on the results of the demonstration test on the methanol conversion at oil-fired power plant. Feasibility study of a new system for the stabilized supply of fuel use methanol; 1991 nendo sekiyu karyoku hatsudensho metanoru tenkan tou jissho shiken. Nenryo you metanoru kyokyu antei ka no tameno shin system no kanosei chosa hokokusho}
author = {None}
abstractNote = {As a part of the project on the demonstration test on the methanol conversion at oil-fired power plant, feasibility study was made of a new system for methanol production by using abundant hydraulic power energy overseas and by combining water electrolysis and coal gasification technology, and the FY 1991 results were summarized. As a result of the survey, the following were selected as water electrolysis facilities: high efficiency/high current density/simplification system and solid polyelectrolyte electrolysis system with a high purity of hydrogen gas. As the coal gasifier, the oxygen blown furnace was selected which has a high carbon utilization factor, is able to gasify coal at high pressure, has no unnecessary N{sub 2}, and is being used in the integrated coal gasification combined cycle power system. As methanol synthesis facilities, the MGC/MHI method super converter was selected. Assuming the output of hydroelectric power generation to be 4,000MW, conceptual design of the optimum system was made. The methanol cost was estimated under the conditions written below: cost of hydroelectric power generation at site: 2-5 yen/kWh, coal unit price at site: 5,000-6,000 yen/t, transportation distance: 5,000-10,000 km. (NEDO)}
place = {Japan}
year = {1992}
month = {Mar}
}