Fiscal 1994 achievement report 1/2. Coal liquefaction technology development - Bituminous coal liquefaction technology development - Study for supporting pilot plant - Study using 1t/d PSU (Study of operation using PSU); 1994 nendo seika hokokusho 1/2. Sekitan ekika gijutsu kaihatsu - Rekiseitan ekika gijutsu no kaihatsu - Pilot plant no shien kenkyu - 1t/d process support unit (PSU) ni yoru kenkyu (PSU ni yoru unten kenkyu)

Abstract

The operation of a 1t/d PSU (process support unit) was studied in the NEDOL coal liquefaction process. Modification was made, which involved the installation of a high-temperature/high-pressure sampling device for observing reaction and fluidity in the liquefaction reactor, a differential pressure measuring device, and a neutron attenuation-aided measuring device. Relative to coal injection, a 49.5-day and 49.3-day slurry injections were carried out using Tanito Harum coal, when impacts on the product yield and the operability of the unit were examined. A verification test was conducted for an improved hydrogenation catalyst, and liquefaction reactor characteristics were investigated. During a 19-day operation for the study of maintenance, newly installed equipment and devices were verified for function, and operating methods were probed into. In the survey of environments, characteristics were examined of the wastewater discharged from the Tanito Harum coal liquefaction process, and wastewater treatment methods were studied. The air, odor, and tar mist were examined with the PSU in operation, and the measured values were found to be below the management limits showing that its operation did not pose any problems relating to working environments. (NEDO)
Publication Date:
Mar 01, 1995
Product Type:
Technical Report
Report Number:
JP-NEDO-010019608
Resource Relation:
Other Information: PBD: Mar 1995
Subject:
01 COAL, LIGNITE, AND PEAT; COAL LIQUEFACTION; BITUMINOUS COAL; PILOT PLANTS; OPERATION; SAMPLING; MEASURING INSTRUMENTS; SLURRIES; CHEMICAL REACTION YIELD; CATALYSTS; HYDRIDATION; PERFORMANCE TESTING; WASTE WATER; ODOR
OSTI ID:
20270985
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN0240013
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20270985
Submitting Site:
NEDO
Size:
493 pages
Announcement Date:
Apr 17, 2003

Citation Formats

None. Fiscal 1994 achievement report 1/2. Coal liquefaction technology development - Bituminous coal liquefaction technology development - Study for supporting pilot plant - Study using 1t/d PSU (Study of operation using PSU); 1994 nendo seika hokokusho 1/2. Sekitan ekika gijutsu kaihatsu - Rekiseitan ekika gijutsu no kaihatsu - Pilot plant no shien kenkyu - 1t/d process support unit (PSU) ni yoru kenkyu (PSU ni yoru unten kenkyu). Japan: N. p., 1995. Web.
None. Fiscal 1994 achievement report 1/2. Coal liquefaction technology development - Bituminous coal liquefaction technology development - Study for supporting pilot plant - Study using 1t/d PSU (Study of operation using PSU); 1994 nendo seika hokokusho 1/2. Sekitan ekika gijutsu kaihatsu - Rekiseitan ekika gijutsu no kaihatsu - Pilot plant no shien kenkyu - 1t/d process support unit (PSU) ni yoru kenkyu (PSU ni yoru unten kenkyu). Japan.
None. 1995. "Fiscal 1994 achievement report 1/2. Coal liquefaction technology development - Bituminous coal liquefaction technology development - Study for supporting pilot plant - Study using 1t/d PSU (Study of operation using PSU); 1994 nendo seika hokokusho 1/2. Sekitan ekika gijutsu kaihatsu - Rekiseitan ekika gijutsu no kaihatsu - Pilot plant no shien kenkyu - 1t/d process support unit (PSU) ni yoru kenkyu (PSU ni yoru unten kenkyu)." Japan.
@misc{etde_20270985,
title = {Fiscal 1994 achievement report 1/2. Coal liquefaction technology development - Bituminous coal liquefaction technology development - Study for supporting pilot plant - Study using 1t/d PSU (Study of operation using PSU); 1994 nendo seika hokokusho 1/2. Sekitan ekika gijutsu kaihatsu - Rekiseitan ekika gijutsu no kaihatsu - Pilot plant no shien kenkyu - 1t/d process support unit (PSU) ni yoru kenkyu (PSU ni yoru unten kenkyu)}
author = {None}
abstractNote = {The operation of a 1t/d PSU (process support unit) was studied in the NEDOL coal liquefaction process. Modification was made, which involved the installation of a high-temperature/high-pressure sampling device for observing reaction and fluidity in the liquefaction reactor, a differential pressure measuring device, and a neutron attenuation-aided measuring device. Relative to coal injection, a 49.5-day and 49.3-day slurry injections were carried out using Tanito Harum coal, when impacts on the product yield and the operability of the unit were examined. A verification test was conducted for an improved hydrogenation catalyst, and liquefaction reactor characteristics were investigated. During a 19-day operation for the study of maintenance, newly installed equipment and devices were verified for function, and operating methods were probed into. In the survey of environments, characteristics were examined of the wastewater discharged from the Tanito Harum coal liquefaction process, and wastewater treatment methods were studied. The air, odor, and tar mist were examined with the PSU in operation, and the measured values were found to be below the management limits showing that its operation did not pose any problems relating to working environments. (NEDO)}
place = {Japan}
year = {1995}
month = {Mar}
}