You need JavaScript to view this

Consultation on the implementation of Engineering Recommendation ER G77. Volume 1: Summary report

Abstract

The paper is a summary report on consultation inside the Electricity and PV Industry leading to publication of ER G77/1: 'Connection of Single-Phase Inverter Connected Photovoltaic (PV) Generating Equipment of up to 5kVA in Parallel with a Distribution Network Operators (DNOs) Distribution System'. Technical work on ETSU/S/P2/0040 is also reported. The project is a continuation of ETSU/S/P2/00215 which set-up the 'ER G77 Working Group' in order to (i) continue consultation with DNOs and the PV industry; (ii) monitor and make use of experience resulting from implementation of ER G77; (iii) act as a forum for discussion of improvements to ER G77; (iv) assist projects like the DTI supported Domestic Field Trial; (v) provide a link to BSI Standards Work in the field; (vi) provide a link with sub-projects investigating questions related to ER G77. Overall, the goal is to develop a final version of ER G77/1 acceptable to both the electricity supply industry and the PV industry. A revised version of ER G/771 is included.
Publication Date:
Jul 01, 2002
Product Type:
Technical Report
Report Number:
ETSU-S-P-2/00356/REP/1; DTI/Pub-URN-02/809
Resource Relation:
Other Information: PBD: 2002
Subject:
14 SOLAR ENERGY; ELECTRIC POWER INDUSTRY; PHOTOVOLTAIC POWER SUPPLIES; POWER DISTRIBUTION; SUSTAINABLE DEVELOPMENT; RECOMMENDATIONS; STANDARDS; DOCUMENTATION
Sponsoring Organizations:
Energy Technology Support Unit, Harwell (United Kingdom); Department of Trade and Industry, London (United Kingdom)
OSTI ID:
20249945
Research Organizations:
Halcrow Group Ltd. (United Kingdom)
Country of Origin:
United Kingdom
Language:
English
Other Identifying Numbers:
TRN: GB0220279
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20249945
Submitting Site:
GB
Size:
66 pages
Announcement Date:
Oct 02, 2002

Citation Formats

Thornycroft, J, Cotterell, M, and Collinson, A. Consultation on the implementation of Engineering Recommendation ER G77. Volume 1: Summary report. United Kingdom: N. p., 2002. Web.
Thornycroft, J, Cotterell, M, & Collinson, A. Consultation on the implementation of Engineering Recommendation ER G77. Volume 1: Summary report. United Kingdom.
Thornycroft, J, Cotterell, M, and Collinson, A. 2002. "Consultation on the implementation of Engineering Recommendation ER G77. Volume 1: Summary report." United Kingdom.
@misc{etde_20249945,
title = {Consultation on the implementation of Engineering Recommendation ER G77. Volume 1: Summary report}
author = {Thornycroft, J, Cotterell, M, and Collinson, A}
abstractNote = {The paper is a summary report on consultation inside the Electricity and PV Industry leading to publication of ER G77/1: 'Connection of Single-Phase Inverter Connected Photovoltaic (PV) Generating Equipment of up to 5kVA in Parallel with a Distribution Network Operators (DNOs) Distribution System'. Technical work on ETSU/S/P2/0040 is also reported. The project is a continuation of ETSU/S/P2/00215 which set-up the 'ER G77 Working Group' in order to (i) continue consultation with DNOs and the PV industry; (ii) monitor and make use of experience resulting from implementation of ER G77; (iii) act as a forum for discussion of improvements to ER G77; (iv) assist projects like the DTI supported Domestic Field Trial; (v) provide a link to BSI Standards Work in the field; (vi) provide a link with sub-projects investigating questions related to ER G77. Overall, the goal is to develop a final version of ER G77/1 acceptable to both the electricity supply industry and the PV industry. A revised version of ER G/771 is included.}
place = {United Kingdom}
year = {2002}
month = {Jul}
}