FY 2000 report on the basic survey to promote Joint Implementation, etc. Energy conservation by modernization of a cement plant (Double Horse Cement Co.) in China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku cement kojo (Double Horse Cement) kindaika ni yoru sho energy

Abstract

An investigational study was conducted of possibilities of energy conservation and greenhouse effect gas emission reduction in the cement production process of Double Horse Cement Co., Mianyang City, Sichuan Province, China. Double Horse Cement adopts the wet type long kiln production system and has a production ability of approximately 1.5 million t/y. In the project, as to three production lines out of the six production lines, improvement was planned to be made of the technologies on the following: mixing of raw materials, grinding of raw materials, NSP, clinker cooler, clinker pre-grinder, high-efficiency separator, waste heat use power generation, etc. As a result of the study, it was found that the energy conservation amount obtained was 54,646 toe/y. And, the amount of greenhouse effect gas reduction was 169,086 t-CO2/y. The total fund required for this project was approximately 5.553 billion yen and the internal earning rate was 7.36% after tax. When the project is carried out, expenses vs. effects are 9.8 toe/million yen in energy conservation amount and 30.4 t-CO2/million yen in greenhouse effect gas reduction. (NEDO)
Authors:
Publication Date:
Mar 01, 2001
Product Type:
Technical Report
Report Number:
JP-NEDO-010018857
Resource Relation:
Other Information: PBD: Mar 2001
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; CHINA; CEMENT INDUSTRY; PLANTS; ENERGY CONSERVATION; GREENHOUSE GASES; POLLUTION ABATEMENT; KILNS; WASTE HEAT UTILIZATION; POWER GENERATION; INVESTMENT; COST BENEFIT ANALYSIS
OSTI ID:
20225555
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN0141170
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20225555
Submitting Site:
NEDO
Size:
[230] pages
Announcement Date:
Dec 04, 2002

Citation Formats

NONE. FY 2000 report on the basic survey to promote Joint Implementation, etc. Energy conservation by modernization of a cement plant (Double Horse Cement Co.) in China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku cement kojo (Double Horse Cement) kindaika ni yoru sho energy. Japan: N. p., 2001. Web.
NONE. FY 2000 report on the basic survey to promote Joint Implementation, etc. Energy conservation by modernization of a cement plant (Double Horse Cement Co.) in China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku cement kojo (Double Horse Cement) kindaika ni yoru sho energy. Japan.
NONE. 2001. "FY 2000 report on the basic survey to promote Joint Implementation, etc. Energy conservation by modernization of a cement plant (Double Horse Cement Co.) in China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku cement kojo (Double Horse Cement) kindaika ni yoru sho energy." Japan.
@misc{etde_20225555,
title = {FY 2000 report on the basic survey to promote Joint Implementation, etc. Energy conservation by modernization of a cement plant (Double Horse Cement Co.) in China; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Chugoku cement kojo (Double Horse Cement) kindaika ni yoru sho energy}
author = {NONE}
abstractNote = {An investigational study was conducted of possibilities of energy conservation and greenhouse effect gas emission reduction in the cement production process of Double Horse Cement Co., Mianyang City, Sichuan Province, China. Double Horse Cement adopts the wet type long kiln production system and has a production ability of approximately 1.5 million t/y. In the project, as to three production lines out of the six production lines, improvement was planned to be made of the technologies on the following: mixing of raw materials, grinding of raw materials, NSP, clinker cooler, clinker pre-grinder, high-efficiency separator, waste heat use power generation, etc. As a result of the study, it was found that the energy conservation amount obtained was 54,646 toe/y. And, the amount of greenhouse effect gas reduction was 169,086 t-CO2/y. The total fund required for this project was approximately 5.553 billion yen and the internal earning rate was 7.36% after tax. When the project is carried out, expenses vs. effects are 9.8 toe/million yen in energy conservation amount and 30.4 t-CO2/million yen in greenhouse effect gas reduction. (NEDO)}
place = {Japan}
year = {2001}
month = {Mar}
}