You need JavaScript to view this

FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa

Abstract

For the purpose of conserving energy and reducing greenhouse effect gas emission, survey was conducted for the repair plan for Fenchugangi fertilizer plant in Bangladesh. In the survey, studied were measures to increase production, measures to prolong the plant life, energy conservation measures and environmental measures. As a result of the study, it was confirmed that if the production amount targeted at first is recovered and the consumption amount of natural gas can be reduced down to the original target by rehabilitating the superannuated equipment/machines and by supplying/preparing the spare parts in shortage, the reduction in greenhouse effect gas emission is achieved and the production cost of urea fertilizer is lowered. Further, it was found that by carrying out this, energy efficiency can be heightened at the parts which can be replaced with the newest processes. The energy conservation amount calculated was 25,890 toe/y, and the amount of greenhouse effect gas reduction 60,448 t-CO2/y. The investment amount was approximately $19,106,000. The total interest is to be raised by soft loan, and the internal earning rate was 9.04% with the present prices of natural gas and urea. (NEDO)
Publication Date:
Mar 01, 2001
Product Type:
Technical Report
Report Number:
JP-NEDO-010018853
Resource Relation:
Other Information: PBD: Mar 2001
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; BANGLADESH; FERTILIZERS; PLANTS; ENERGY CONSERVATION; GREENHOUSE GASES; POLLUTION ABATEMENT; NATURAL GAS; FUEL CONSUMPTION; UREA; ENERGY EFFICIENCY; COST BENEFIT ANALYSIS
OSTI ID:
20225551
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN0141166
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20225551
Submitting Site:
NEDO
Size:
[160] pages
Announcement Date:
Dec 05, 2002

Citation Formats

None. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa. Japan: N. p., 2001. Web.
None. FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa. Japan.
None. 2001. "FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa." Japan.
@misc{etde_20225551,
title = {FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa}
author = {None}
abstractNote = {For the purpose of conserving energy and reducing greenhouse effect gas emission, survey was conducted for the repair plan for Fenchugangi fertilizer plant in Bangladesh. In the survey, studied were measures to increase production, measures to prolong the plant life, energy conservation measures and environmental measures. As a result of the study, it was confirmed that if the production amount targeted at first is recovered and the consumption amount of natural gas can be reduced down to the original target by rehabilitating the superannuated equipment/machines and by supplying/preparing the spare parts in shortage, the reduction in greenhouse effect gas emission is achieved and the production cost of urea fertilizer is lowered. Further, it was found that by carrying out this, energy efficiency can be heightened at the parts which can be replaced with the newest processes. The energy conservation amount calculated was 25,890 toe/y, and the amount of greenhouse effect gas reduction 60,448 t-CO2/y. The investment amount was approximately $19,106,000. The total interest is to be raised by soft loan, and the internal earning rate was 9.04% with the present prices of natural gas and urea. (NEDO)}
place = {Japan}
year = {2001}
month = {Mar}
}