Abstract
For the purpose of conserving energy and reducing greenhouse effect gas emission, survey was conducted for the repair plan for Fenchugangi fertilizer plant in Bangladesh. In the survey, studied were measures to increase production, measures to prolong the plant life, energy conservation measures and environmental measures. As a result of the study, it was confirmed that if the production amount targeted at first is recovered and the consumption amount of natural gas can be reduced down to the original target by rehabilitating the superannuated equipment/machines and by supplying/preparing the spare parts in shortage, the reduction in greenhouse effect gas emission is achieved and the production cost of urea fertilizer is lowered. Further, it was found that by carrying out this, energy efficiency can be heightened at the parts which can be replaced with the newest processes. The energy conservation amount calculated was 25,890 toe/y, and the amount of greenhouse effect gas reduction 60,448 t-CO2/y. The investment amount was approximately $19,106,000. The total interest is to be raised by soft loan, and the internal earning rate was 9.04% with the present prices of natural gas and urea. (NEDO)
Citation Formats
None.
FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa.
Japan: N. p.,
2001.
Web.
None.
FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa.
Japan.
None.
2001.
"FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa."
Japan.
@misc{etde_20225551,
title = {FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa}
author = {None}
abstractNote = {For the purpose of conserving energy and reducing greenhouse effect gas emission, survey was conducted for the repair plan for Fenchugangi fertilizer plant in Bangladesh. In the survey, studied were measures to increase production, measures to prolong the plant life, energy conservation measures and environmental measures. As a result of the study, it was confirmed that if the production amount targeted at first is recovered and the consumption amount of natural gas can be reduced down to the original target by rehabilitating the superannuated equipment/machines and by supplying/preparing the spare parts in shortage, the reduction in greenhouse effect gas emission is achieved and the production cost of urea fertilizer is lowered. Further, it was found that by carrying out this, energy efficiency can be heightened at the parts which can be replaced with the newest processes. The energy conservation amount calculated was 25,890 toe/y, and the amount of greenhouse effect gas reduction 60,448 t-CO2/y. The investment amount was approximately $19,106,000. The total interest is to be raised by soft loan, and the internal earning rate was 9.04% with the present prices of natural gas and urea. (NEDO)}
place = {Japan}
year = {2001}
month = {Mar}
}
title = {FY 2000 report on the basic survey to promote Joint Implementation, etc. Survey on the repair plan for Fenchugangi fertilizer plant in Bangladesh; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bangladesh koku Fenchugangi hiryo kojo kaishu keikaku chosa}
author = {None}
abstractNote = {For the purpose of conserving energy and reducing greenhouse effect gas emission, survey was conducted for the repair plan for Fenchugangi fertilizer plant in Bangladesh. In the survey, studied were measures to increase production, measures to prolong the plant life, energy conservation measures and environmental measures. As a result of the study, it was confirmed that if the production amount targeted at first is recovered and the consumption amount of natural gas can be reduced down to the original target by rehabilitating the superannuated equipment/machines and by supplying/preparing the spare parts in shortage, the reduction in greenhouse effect gas emission is achieved and the production cost of urea fertilizer is lowered. Further, it was found that by carrying out this, energy efficiency can be heightened at the parts which can be replaced with the newest processes. The energy conservation amount calculated was 25,890 toe/y, and the amount of greenhouse effect gas reduction 60,448 t-CO2/y. The investment amount was approximately $19,106,000. The total interest is to be raised by soft loan, and the internal earning rate was 9.04% with the present prices of natural gas and urea. (NEDO)}
place = {Japan}
year = {2001}
month = {Mar}
}