Abstract
In many instances wells are temporary abandoned just after cementing liner to be completed later or to have the BOP removed to change rams. In these cases, an additional volume of slurry is designed in order to bring the top of cement plug over the liner top, thus saving the time required for all full plugging operation. (author)
Hiss Filho, Paulo Henrique;
Costa Junior, Pedro Americo da;
Viana, Jose Luis Rodrigues
[1]
- PETROBRAS, Rio de Janeiro, RJ (Brazil). Distrito de Pefuracao do Sudeste. Div. de Tecnicas de Perfuracao
Citation Formats
Hiss Filho, Paulo Henrique, Costa Junior, Pedro Americo da, and Viana, Jose Luis Rodrigues.
Temporary abandonment cement plug on the liner top; Tampao de abandono temporario na boca do liner.
Brazil: N. p.,
1994.
Web.
Hiss Filho, Paulo Henrique, Costa Junior, Pedro Americo da, & Viana, Jose Luis Rodrigues.
Temporary abandonment cement plug on the liner top; Tampao de abandono temporario na boca do liner.
Brazil.
Hiss Filho, Paulo Henrique, Costa Junior, Pedro Americo da, and Viana, Jose Luis Rodrigues.
1994.
"Temporary abandonment cement plug on the liner top; Tampao de abandono temporario na boca do liner."
Brazil.
@misc{etde_20168495,
title = {Temporary abandonment cement plug on the liner top; Tampao de abandono temporario na boca do liner}
author = {Hiss Filho, Paulo Henrique, Costa Junior, Pedro Americo da, and Viana, Jose Luis Rodrigues}
abstractNote = {In many instances wells are temporary abandoned just after cementing liner to be completed later or to have the BOP removed to change rams. In these cases, an additional volume of slurry is designed in order to bring the top of cement plug over the liner top, thus saving the time required for all full plugging operation. (author)}
place = {Brazil}
year = {1994}
month = {Jul}
}
title = {Temporary abandonment cement plug on the liner top; Tampao de abandono temporario na boca do liner}
author = {Hiss Filho, Paulo Henrique, Costa Junior, Pedro Americo da, and Viana, Jose Luis Rodrigues}
abstractNote = {In many instances wells are temporary abandoned just after cementing liner to be completed later or to have the BOP removed to change rams. In these cases, an additional volume of slurry is designed in order to bring the top of cement plug over the liner top, thus saving the time required for all full plugging operation. (author)}
place = {Brazil}
year = {1994}
month = {Jul}
}