Report on the phase II R and D program of magneto-hydro-dynamics (MHD) electrical power generation. Prompt report by Electrotechnical Laboratory; Denji ryutai (MHD) hatsuden no dainiki kenkyu kaihatsu ni kansuru hokokusho. Densoken kenkyu sokuho

Abstract

This report summarizes results of the phase II R and D program of MHD electrical power generation (FY 1976 - 1983), which has been now completed. The phase II R and D efforts were concentrated on development of the durable power generation channels, where the designs and manufacture of the Mark II system were started, and the elementary techniques were simultaneously studied for, e.g., phenomena occurring around the electrodes, seed condensation and its effects on the electrode phenomena, and electrode and insulator materials for the power generation channels. The power generation channel was tested for its durability for a total of 430 hours, after it was incorporated in the Mark II system. The MHD power generation can incorporate direct combustion of coal, and will hold a dominant position in coal-fired power generation, which is expected to grow in the future. For this reason, the basic research schedules were revised in March, 1983, and the Mark II system was operated by firing a mixed fuel of kerosene and finely divided coal in a kerosene combustor, in line with the revised project, to understand the basic power generation characteristics with the combustion gases containing coal slag. (NEDO)
Publication Date:
Jul 28, 1989
Product Type:
Technical Report
Report Number:
JP-NEDO-010017824
Resource Relation:
Other Information: PBD: 28 Jul 1989
Subject:
30 DIRECT ENERGY CONVERSION; MHD POWER PLANTS; MHD GENERATORS; MHD CHANNELS; ELECTRODES; SEEDS; ELECTRICAL INSULATORS; PERFORMANCE TESTING; COAL; KEROSENE; COMBUSTORS
OSTI ID:
20123874
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN0040986
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20123874
Submitting Site:
NEDO
Size:
278 pages
Announcement Date:
May 24, 2002

Citation Formats

None. Report on the phase II R and D program of magneto-hydro-dynamics (MHD) electrical power generation. Prompt report by Electrotechnical Laboratory; Denji ryutai (MHD) hatsuden no dainiki kenkyu kaihatsu ni kansuru hokokusho. Densoken kenkyu sokuho. Japan: N. p., 1989. Web.
None. Report on the phase II R and D program of magneto-hydro-dynamics (MHD) electrical power generation. Prompt report by Electrotechnical Laboratory; Denji ryutai (MHD) hatsuden no dainiki kenkyu kaihatsu ni kansuru hokokusho. Densoken kenkyu sokuho. Japan.
None. 1989. "Report on the phase II R and D program of magneto-hydro-dynamics (MHD) electrical power generation. Prompt report by Electrotechnical Laboratory; Denji ryutai (MHD) hatsuden no dainiki kenkyu kaihatsu ni kansuru hokokusho. Densoken kenkyu sokuho." Japan.
@misc{etde_20123874,
title = {Report on the phase II R and D program of magneto-hydro-dynamics (MHD) electrical power generation. Prompt report by Electrotechnical Laboratory; Denji ryutai (MHD) hatsuden no dainiki kenkyu kaihatsu ni kansuru hokokusho. Densoken kenkyu sokuho}
author = {None}
abstractNote = {This report summarizes results of the phase II R and D program of MHD electrical power generation (FY 1976 - 1983), which has been now completed. The phase II R and D efforts were concentrated on development of the durable power generation channels, where the designs and manufacture of the Mark II system were started, and the elementary techniques were simultaneously studied for, e.g., phenomena occurring around the electrodes, seed condensation and its effects on the electrode phenomena, and electrode and insulator materials for the power generation channels. The power generation channel was tested for its durability for a total of 430 hours, after it was incorporated in the Mark II system. The MHD power generation can incorporate direct combustion of coal, and will hold a dominant position in coal-fired power generation, which is expected to grow in the future. For this reason, the basic research schedules were revised in March, 1983, and the Mark II system was operated by firing a mixed fuel of kerosene and finely divided coal in a kerosene combustor, in line with the revised project, to understand the basic power generation characteristics with the combustion gases containing coal slag. (NEDO)}
place = {Japan}
year = {1989}
month = {Jul}
}