You need JavaScript to view this

Report on results of R and D of coal liquefaction technology in fiscal 1981; 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu seika setsumeisho

Abstract

This paper explains the results of development of coal liquefaction technology under the Sunshine Project in fiscal 1981. In connection with solvent extraction and liquefaction, an 1 t/day experimental plant was completed for bituminous coals and operated continuously for 153 hours. An examination also started for the development of a 250 t/day pilot plant. As the element studies, R and D is in progress on the solvent extraction and liquefaction process, solid-liquid separation, secondary hydrogenation, and plant materials. In brown coals, the construction work of a 50 t/day pilot plant started for the purpose of establishing liquefaction technology for brown coal in Victoria State, Australia, with a part of the equipment manufactured. As the element studies, research was conducted on primary hydrogenation, deliming, secondary hydrogenation, dehydration and catalysts. In solvolysis liquefaction, a short-time concluding liquefaction reaction was continuously performed by a plant of 1 t/day scale. In direct hydro-liquefaction, a 2.4 t/day experimental plant was constructed, with the element studies conducted successively. In other words, researches were carried out by the bench scale plant on liquefaction, solid-liquid separation, iron-based catalysts, catalyst and reutilization, motive force recovery system by hydrohoist, and effect of preheating and deaeration. (NEDO)
Publication Date:
Mar 01, 1982
Product Type:
Technical Report
Report Number:
JP-NEDO-010017602
Resource Relation:
Other Information: PBD: Mar 1982
Subject:
01 COAL, LIGNITE, AND PEAT; COAL LIQUEFACTION; SUNSHINE PROJECT; SOLVENT EXTRACTION; BITUMINOUS COAL; PROCESS DEVELOPMENT UNITS; PILOT PLANTS; SEPARATION PROCESSES; HYDROGENATION; CORROSION RESISTANCE; BROWN COAL; VICTORIA; DEASHING; CATALYSTS; SOLVOLYSIS; HYDRAULIC TRANSPORT
OSTI ID:
20123653
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN0040765
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20123653
Submitting Site:
NEDO
Size:
89 pages
Announcement Date:
May 24, 2002

Citation Formats

None. Report on results of R and D of coal liquefaction technology in fiscal 1981; 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu seika setsumeisho. Japan: N. p., 1982. Web.
None. Report on results of R and D of coal liquefaction technology in fiscal 1981; 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu seika setsumeisho. Japan.
None. 1982. "Report on results of R and D of coal liquefaction technology in fiscal 1981; 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu seika setsumeisho." Japan.
@misc{etde_20123653,
title = {Report on results of R and D of coal liquefaction technology in fiscal 1981; 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu seika setsumeisho}
author = {None}
abstractNote = {This paper explains the results of development of coal liquefaction technology under the Sunshine Project in fiscal 1981. In connection with solvent extraction and liquefaction, an 1 t/day experimental plant was completed for bituminous coals and operated continuously for 153 hours. An examination also started for the development of a 250 t/day pilot plant. As the element studies, R and D is in progress on the solvent extraction and liquefaction process, solid-liquid separation, secondary hydrogenation, and plant materials. In brown coals, the construction work of a 50 t/day pilot plant started for the purpose of establishing liquefaction technology for brown coal in Victoria State, Australia, with a part of the equipment manufactured. As the element studies, research was conducted on primary hydrogenation, deliming, secondary hydrogenation, dehydration and catalysts. In solvolysis liquefaction, a short-time concluding liquefaction reaction was continuously performed by a plant of 1 t/day scale. In direct hydro-liquefaction, a 2.4 t/day experimental plant was constructed, with the element studies conducted successively. In other words, researches were carried out by the bench scale plant on liquefaction, solid-liquid separation, iron-based catalysts, catalyst and reutilization, motive force recovery system by hydrohoist, and effect of preheating and deaeration. (NEDO)}
place = {Japan}
year = {1982}
month = {Mar}
}