Abstract
This program is aimed at construction and operation of a 2.4 T/D test plant for eventual commercialization of the direct hydrogenation type liquefaction process. The FY 1980 program includes designs of the test plant, procurement and manufacture of some equipment, and works for construction of the bases, buildings and scaffolds. The construction site for the 2.4 T/D plant was changed in July 1980 from Mitsui Engineering and Shipbuilding's Chiba works to NKK's Keihin Steelworks, which was accompanied by some changes in the basic and detailed designs. The detailed designs were reviewed for construction of the test plant, to reflect the results of the individual elementary researches. The works for the FY 1980 program also include preparations for obtaining approvals of plant construction, based on the revised designs, from the related government offices, and equipment procurement. This paper presents the major drawings for the plant construction, including those for PID designs, overall plant layouts, piping systems, buildings, scaffolds, and pipe racks. The loading data are also included. (NEDO)
Citation Formats
None.
FY 1980 Report on results of Sunshine Project. Research and development of coal liquefaction techniques (Development of direct hydrogenation type liquefaction plant and 2.4 T/D test plant); 1980 nendo sekitan ekika gijutsu no kenkyu kaihatsu, chokusetsu suiten ekika plant no kaihatsu seika hokokusho. 2.4T/nichi jikken plant no kaihatsu.
Japan: N. p.,
1981.
Web.
None.
FY 1980 Report on results of Sunshine Project. Research and development of coal liquefaction techniques (Development of direct hydrogenation type liquefaction plant and 2.4 T/D test plant); 1980 nendo sekitan ekika gijutsu no kenkyu kaihatsu, chokusetsu suiten ekika plant no kaihatsu seika hokokusho. 2.4T/nichi jikken plant no kaihatsu.
Japan.
None.
1981.
"FY 1980 Report on results of Sunshine Project. Research and development of coal liquefaction techniques (Development of direct hydrogenation type liquefaction plant and 2.4 T/D test plant); 1980 nendo sekitan ekika gijutsu no kenkyu kaihatsu, chokusetsu suiten ekika plant no kaihatsu seika hokokusho. 2.4T/nichi jikken plant no kaihatsu."
Japan.
@misc{etde_20123638,
title = {FY 1980 Report on results of Sunshine Project. Research and development of coal liquefaction techniques (Development of direct hydrogenation type liquefaction plant and 2.4 T/D test plant); 1980 nendo sekitan ekika gijutsu no kenkyu kaihatsu, chokusetsu suiten ekika plant no kaihatsu seika hokokusho. 2.4T/nichi jikken plant no kaihatsu}
author = {None}
abstractNote = {This program is aimed at construction and operation of a 2.4 T/D test plant for eventual commercialization of the direct hydrogenation type liquefaction process. The FY 1980 program includes designs of the test plant, procurement and manufacture of some equipment, and works for construction of the bases, buildings and scaffolds. The construction site for the 2.4 T/D plant was changed in July 1980 from Mitsui Engineering and Shipbuilding's Chiba works to NKK's Keihin Steelworks, which was accompanied by some changes in the basic and detailed designs. The detailed designs were reviewed for construction of the test plant, to reflect the results of the individual elementary researches. The works for the FY 1980 program also include preparations for obtaining approvals of plant construction, based on the revised designs, from the related government offices, and equipment procurement. This paper presents the major drawings for the plant construction, including those for PID designs, overall plant layouts, piping systems, buildings, scaffolds, and pipe racks. The loading data are also included. (NEDO)}
place = {Japan}
year = {1981}
month = {Mar}
}
title = {FY 1980 Report on results of Sunshine Project. Research and development of coal liquefaction techniques (Development of direct hydrogenation type liquefaction plant and 2.4 T/D test plant); 1980 nendo sekitan ekika gijutsu no kenkyu kaihatsu, chokusetsu suiten ekika plant no kaihatsu seika hokokusho. 2.4T/nichi jikken plant no kaihatsu}
author = {None}
abstractNote = {This program is aimed at construction and operation of a 2.4 T/D test plant for eventual commercialization of the direct hydrogenation type liquefaction process. The FY 1980 program includes designs of the test plant, procurement and manufacture of some equipment, and works for construction of the bases, buildings and scaffolds. The construction site for the 2.4 T/D plant was changed in July 1980 from Mitsui Engineering and Shipbuilding's Chiba works to NKK's Keihin Steelworks, which was accompanied by some changes in the basic and detailed designs. The detailed designs were reviewed for construction of the test plant, to reflect the results of the individual elementary researches. The works for the FY 1980 program also include preparations for obtaining approvals of plant construction, based on the revised designs, from the related government offices, and equipment procurement. This paper presents the major drawings for the plant construction, including those for PID designs, overall plant layouts, piping systems, buildings, scaffolds, and pipe racks. The loading data are also included. (NEDO)}
place = {Japan}
year = {1981}
month = {Mar}
}