You need JavaScript to view this

FY 1974 Report on results of Sunshine Project. Research and development of cement serviceable under geothermal conditions; 1974 nendo chinetsu kankyoka de shiyo kanona cement kenkyu kaihatsu seika hokokusho

Abstract

Researches are conducted for the (research and development of cement serviceable under geothermal conditions). The research items include (1) surveys on test apparatuses, (2) basic surveys on cement, additives and cement slurry, (3) R and D of cement, and (4) researches on cement additives and slurry. For the item (1), bright prospects are obtained that US's Chandler can supply a thickening time tester serviceable at up to 750 degrees F and 40,000 psi, and a cement curing device serviceable at up to 750 degrees F and 5,000 psi. For the item (2), the surveys are conducted on the existing techniques for curing reactions and chemical resistance of cement at elevated temperature and pressure. For the item (3), the researches are conducted to develop cement resistant to heat and sulfates for geothermal development purposes, where portland cement and mixed portland cement are used as the bases which are incorporated with silica powder. As a result, it is found that the optimum Ca/SiO{sub 2} and CaO/SiO{sub 2}+Al{sub 2}O{sub 3} molar ratios are around 1.0 to 0.9 and 0.9 to 0.8, respectively. For the item (4), the tests are conducted to determine adequate conditions of conductor pipe cementing and cement slurry for 1,500m  More>>
Authors:
"NONE"
Publication Date:
Mar 30, 1975
Product Type:
Technical Report
Report Number:
JP-NEDO-010018405
Resource Relation:
Other Information: PBD: 30 Mar 1975
Subject:
15 GEOTHERMAL ENERGY; SUNSHINE PROJECT; GEOTHERMAL SYSTEMS; CEMENTS; ADDITIVES; SLURRIES; ENRICHMENT; CURING; SILICA; CALCIUM OXIDES; SILICON OXIDES; ALUMINIUM OXIDES
OSTI ID:
20102598
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN0040360
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20102598
Submitting Site:
NEDO
Size:
[120] pages
Announcement Date:

Citation Formats

FY 1974 Report on results of Sunshine Project. Research and development of cement serviceable under geothermal conditions; 1974 nendo chinetsu kankyoka de shiyo kanona cement kenkyu kaihatsu seika hokokusho. Japan: N. p., 1975. Web.
FY 1974 Report on results of Sunshine Project. Research and development of cement serviceable under geothermal conditions; 1974 nendo chinetsu kankyoka de shiyo kanona cement kenkyu kaihatsu seika hokokusho. Japan.
1975. "FY 1974 Report on results of Sunshine Project. Research and development of cement serviceable under geothermal conditions; 1974 nendo chinetsu kankyoka de shiyo kanona cement kenkyu kaihatsu seika hokokusho." Japan.
@misc{etde_20102598,
title = {FY 1974 Report on results of Sunshine Project. Research and development of cement serviceable under geothermal conditions; 1974 nendo chinetsu kankyoka de shiyo kanona cement kenkyu kaihatsu seika hokokusho}
abstractNote = {Researches are conducted for the (research and development of cement serviceable under geothermal conditions). The research items include (1) surveys on test apparatuses, (2) basic surveys on cement, additives and cement slurry, (3) R and D of cement, and (4) researches on cement additives and slurry. For the item (1), bright prospects are obtained that US's Chandler can supply a thickening time tester serviceable at up to 750 degrees F and 40,000 psi, and a cement curing device serviceable at up to 750 degrees F and 5,000 psi. For the item (2), the surveys are conducted on the existing techniques for curing reactions and chemical resistance of cement at elevated temperature and pressure. For the item (3), the researches are conducted to develop cement resistant to heat and sulfates for geothermal development purposes, where portland cement and mixed portland cement are used as the bases which are incorporated with silica powder. As a result, it is found that the optimum Ca/SiO{sub 2} and CaO/SiO{sub 2}+Al{sub 2}O{sub 3} molar ratios are around 1.0 to 0.9 and 0.9 to 0.8, respectively. For the item (4), the tests are conducted to determine adequate conditions of conductor pipe cementing and cement slurry for 1,500m deep geothermal wells, and the standard composition is established. (NEDO)}
place = {Japan}
year = {1975}
month = {Mar}
}