Sunshine Program for fiscal 1979. Designs and drawings for tower concentration type solar thermal electric power generation pilot plant construction (Volume 1 of 2); 1979 nendo taiyonetsu hatsuden (tower shuko hoshiki) pilot plant no seisaku sekkei. Sekkei tosho (1/2)

Abstract

The pilot plant outputs 1000kWe. Under an automated operation program, 2 operators per shift take care of the whole plant (with one operator on patrol). Daily startup and stop is automatic in principle. The system stops its operation in principle when the computer is down, with accessories to be manually stopped. Warnings are dealt with all by the computer. A safety sequence is organized independent from the computer. The operators interfere with the system for the manipulation of subsystems and adjustment functions. With the plant in normal operation, the computer system logs data, monitors warnings, and the plant is under control of an analog control unit. For the activation of the automatic startup/stop function, the operators have to choose a mode of operation. The above-named document covers, furthermore, the data processing function of the automatic operating system, automatic startup/stop program, hardware, automatic startup/stop table, and a general flow chart describing the automatic startup/stop train. (NEDO)
Publication Date:
Mar 01, 1980
Product Type:
Technical Report
Report Number:
JP-NEDO-0017936
Resource Relation:
Other Information: PBD: Mar 1980
Subject:
14 SOLAR ENERGY; SUNSHINE PROJECT; DISTRIBUTED COLLECTOR POWER PLANTS; PILOT PLANTS; OPERATION; CONTROL SYSTEMS; OPTIMIZATION; OPTIMAL CONTROL; FLAT PLATE COLLECTORS; HEAT STORAGE; HEAT EXCHANGERS; HEAT TRANSFER; PATENTS
OSTI ID:
20094405
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN0040612
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20094405
Submitting Site:
NEDO
Size:
[300] pages
Announcement Date:
May 21, 2002

Citation Formats

None. Sunshine Program for fiscal 1979. Designs and drawings for tower concentration type solar thermal electric power generation pilot plant construction (Volume 1 of 2); 1979 nendo taiyonetsu hatsuden (tower shuko hoshiki) pilot plant no seisaku sekkei. Sekkei tosho (1/2). Japan: N. p., 1980. Web.
None. Sunshine Program for fiscal 1979. Designs and drawings for tower concentration type solar thermal electric power generation pilot plant construction (Volume 1 of 2); 1979 nendo taiyonetsu hatsuden (tower shuko hoshiki) pilot plant no seisaku sekkei. Sekkei tosho (1/2). Japan.
None. 1980. "Sunshine Program for fiscal 1979. Designs and drawings for tower concentration type solar thermal electric power generation pilot plant construction (Volume 1 of 2); 1979 nendo taiyonetsu hatsuden (tower shuko hoshiki) pilot plant no seisaku sekkei. Sekkei tosho (1/2)." Japan.
@misc{etde_20094405,
title = {Sunshine Program for fiscal 1979. Designs and drawings for tower concentration type solar thermal electric power generation pilot plant construction (Volume 1 of 2); 1979 nendo taiyonetsu hatsuden (tower shuko hoshiki) pilot plant no seisaku sekkei. Sekkei tosho (1/2)}
author = {None}
abstractNote = {The pilot plant outputs 1000kWe. Under an automated operation program, 2 operators per shift take care of the whole plant (with one operator on patrol). Daily startup and stop is automatic in principle. The system stops its operation in principle when the computer is down, with accessories to be manually stopped. Warnings are dealt with all by the computer. A safety sequence is organized independent from the computer. The operators interfere with the system for the manipulation of subsystems and adjustment functions. With the plant in normal operation, the computer system logs data, monitors warnings, and the plant is under control of an analog control unit. For the activation of the automatic startup/stop function, the operators have to choose a mode of operation. The above-named document covers, furthermore, the data processing function of the automatic operating system, automatic startup/stop program, hardware, automatic startup/stop table, and a general flow chart describing the automatic startup/stop train. (NEDO)}
place = {Japan}
year = {1980}
month = {Mar}
}