Abstract

This paper describes the achievements in fiscal 1990 on survey on possibility of introducing solar energy into buildings. Capacity of photovoltaic power generation facilities installed on an area of 1600 km{sup 2}, such as roofs of residential houses, schools and building may be calculated on a trial bases as 100 million kW at maximum. The capacity can replace 16% of the total demand and corresponds to 26.30 million kiloliters (9%) as converted to crude oil. If photovoltaic power generation is utilized on buildings of users, diversified technological criteria are required from the viewpoint of legislation covering wide range of architectural, electrical and disaster aspects. However, no direct and clear standards are available now, except for the electric power business law. What are urgently required are solar cell standardization, incentive subsidies, aging safety, institutions for electric power sale and purchase, and establishment of technological criteria. An utilization example survey revealed problems in array installation and size. Increased demand, mass production and cost reduction will create a favorable cycle. Introduction, proliferation, and acceleration under policies at public facilities which are expected of enlightenment and development into other areas will be the effective means for the purpose. (NEDO)
Publication Date:
Mar 01, 1991
Product Type:
Technical Report
Report Number:
JP-NEDO-010011780
Resource Relation:
Other Information: PBD: Mar 1991
Subject:
14 SOLAR ENERGY; SOLAR ENERGY; BUILDINGS; FEASIBILITY STUDIES; PHOTOVOLTAIC POWER PLANTS; FUEL SUBSTITUTION; LEGAL ASPECTS; SAFETY; ENVIRONMENTAL QUALITY; STANDARDIZATION; PUBLIC BUILDINGS
OSTI ID:
20079606
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN9940788
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20079606
Submitting Site:
NEDO
Size:
138 pages
Announcement Date:
Apr 17, 2002

Citation Formats

None. FY 1990 achievement report on the survey of possibility of introducing solar energy into buildings; 1990 nendo taiyo energy no kenchikubutsu eno donyu kanosei chosa seika hokokusho. Japan: N. p., 1991. Web.
None. FY 1990 achievement report on the survey of possibility of introducing solar energy into buildings; 1990 nendo taiyo energy no kenchikubutsu eno donyu kanosei chosa seika hokokusho. Japan.
None. 1991. "FY 1990 achievement report on the survey of possibility of introducing solar energy into buildings; 1990 nendo taiyo energy no kenchikubutsu eno donyu kanosei chosa seika hokokusho." Japan.
@misc{etde_20079606,
title = {FY 1990 achievement report on the survey of possibility of introducing solar energy into buildings; 1990 nendo taiyo energy no kenchikubutsu eno donyu kanosei chosa seika hokokusho}
author = {None}
abstractNote = {This paper describes the achievements in fiscal 1990 on survey on possibility of introducing solar energy into buildings. Capacity of photovoltaic power generation facilities installed on an area of 1600 km{sup 2}, such as roofs of residential houses, schools and building may be calculated on a trial bases as 100 million kW at maximum. The capacity can replace 16% of the total demand and corresponds to 26.30 million kiloliters (9%) as converted to crude oil. If photovoltaic power generation is utilized on buildings of users, diversified technological criteria are required from the viewpoint of legislation covering wide range of architectural, electrical and disaster aspects. However, no direct and clear standards are available now, except for the electric power business law. What are urgently required are solar cell standardization, incentive subsidies, aging safety, institutions for electric power sale and purchase, and establishment of technological criteria. An utilization example survey revealed problems in array installation and size. Increased demand, mass production and cost reduction will create a favorable cycle. Introduction, proliferation, and acceleration under policies at public facilities which are expected of enlightenment and development into other areas will be the effective means for the purpose. (NEDO)}
place = {Japan}
year = {1991}
month = {Mar}
}