Report on results for fiscal 1997 (B edition) on development of coal liquefaction technology. Development of bituminous coal liquefaction technology (research by pilot plant) 1/2; 1997 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B gan). Rekiseitan ekika gijutsu no kaihatsu (pilot plant ni yoru kenkyu) 1/2

Abstract

Through the design, construction and operation of a pilot plant, the NEDOL method was verified, with its operation technology established, and also with a target set in collecting and accumulating data and knowledge required for a commercial plant in the future. With the Run-2, 3, 4 implemented using operating basis coal as the material, the operating stability of equipment/machines was confirmed, and a method of obtaining material balance as well as the operation technology was established, thereby demonstrating the NEDOL process, proving a long-term continuous operability and verifying the highest liquefaction yield. In addition, various process data, engineering data, operation control data, etc., were acquired, classified and analyzed. In the Run-3/4-1, a long-term coal charging continuous operation for 80 days was achieved, as was a high liquefaction yield of 58%. Moreover, data of material balance and thermal balance were obtained, with the performance confirmed of various kinds of equipment. Using the operating basis coat as the material, the coal charging operation of the Run-4-2 was commenced, with the performance verification test carried out for a neutron attenuation tracer method (NAT method), for the purpose of obtaining data of the flow characteristics of the liquefaction reaction tower. (NEDO)
Publication Date:
Jun 01, 1998
Product Type:
Technical Report
Report Number:
JP-NEDO-010012706
Resource Relation:
Other Information: PBD: Jun 1998
Subject:
01 COAL, LIGNITE, AND PEAT; COAL LIQUEFACTION; BITUMINOUS COAL; PILOT PLANTS; MATERIAL BALANCE; OPERATION; OIL YIELDS; ENERGY BALANCE; TRACER TECHNIQUES; DATA ACQUISITION
OSTI ID:
20079482
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
TRN: JN9940664
Availability:
Available to ETDE participating countries only(see www.etde.org); commercial reproduction prohibited; OSTI as DE20079482
Submitting Site:
NEDO
Size:
597 pages
Announcement Date:
Apr 17, 2002

Citation Formats

None. Report on results for fiscal 1997 (B edition) on development of coal liquefaction technology. Development of bituminous coal liquefaction technology (research by pilot plant) 1/2; 1997 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B gan). Rekiseitan ekika gijutsu no kaihatsu (pilot plant ni yoru kenkyu) 1/2. Japan: N. p., 1998. Web.
None. Report on results for fiscal 1997 (B edition) on development of coal liquefaction technology. Development of bituminous coal liquefaction technology (research by pilot plant) 1/2; 1997 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B gan). Rekiseitan ekika gijutsu no kaihatsu (pilot plant ni yoru kenkyu) 1/2. Japan.
None. 1998. "Report on results for fiscal 1997 (B edition) on development of coal liquefaction technology. Development of bituminous coal liquefaction technology (research by pilot plant) 1/2; 1997 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B gan). Rekiseitan ekika gijutsu no kaihatsu (pilot plant ni yoru kenkyu) 1/2." Japan.
@misc{etde_20079482,
title = {Report on results for fiscal 1997 (B edition) on development of coal liquefaction technology. Development of bituminous coal liquefaction technology (research by pilot plant) 1/2; 1997 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B gan). Rekiseitan ekika gijutsu no kaihatsu (pilot plant ni yoru kenkyu) 1/2}
author = {None}
abstractNote = {Through the design, construction and operation of a pilot plant, the NEDOL method was verified, with its operation technology established, and also with a target set in collecting and accumulating data and knowledge required for a commercial plant in the future. With the Run-2, 3, 4 implemented using operating basis coal as the material, the operating stability of equipment/machines was confirmed, and a method of obtaining material balance as well as the operation technology was established, thereby demonstrating the NEDOL process, proving a long-term continuous operability and verifying the highest liquefaction yield. In addition, various process data, engineering data, operation control data, etc., were acquired, classified and analyzed. In the Run-3/4-1, a long-term coal charging continuous operation for 80 days was achieved, as was a high liquefaction yield of 58%. Moreover, data of material balance and thermal balance were obtained, with the performance confirmed of various kinds of equipment. Using the operating basis coat as the material, the coal charging operation of the Run-4-2 was commenced, with the performance verification test carried out for a neutron attenuation tracer method (NAT method), for the purpose of obtaining data of the flow characteristics of the liquefaction reaction tower. (NEDO)}
place = {Japan}
year = {1998}
month = {Jun}
}