CATSIUS CLAY PROJECT: Calculation and testing of behaviour of unsaturated clay as barrier in radioactive waste repositories: stage 3: validation exercises at a large in situ scale

Abstract

Stage 3 of CATSIUS CLAY Project: Validation Exercises at a Large in situ Scale includes two Benchmarks: Benchmark 3.1: In situ Hydration of Boom Clay Pellets (BACCHUS 2) and Benchmark 3.2: FEBEX Mock-up Test. The BACCHUS 2 in situ test was performed in the HADES underground laboratory (Mol, Belgium) to demonstrate and optimize an installation procedure for a clay based material and to study its hydration process. After drilling a vertical shaft (540 mm in diameter, 3.0 m in length) in the host Boom clay, a central filter (90 mm in diameter) was placed, the remaining space was filled with a mixture of clay pellets and clay powder and the assembly was sealed at the upper end by a resin plug (0.20 m in thickness) over which concrete was poured. The test was instrumented so that it could be used as a validation experiment. Total stress, pore water pressure and water content measurements were performed both in the backfill material and in the surrounding clay massif. Once the installation was complete, the natural hydration of the backfill material began (day 0). To accelerate the hydration process, on day 516 water was injected through the central filter. On day 624, after  More>>
Publication Date:
Jul 01, 1999
Product Type:
Technical Report
Report Number:
ENRESA-12/1999
Reference Number:
EDB-01:022911
Resource Relation:
Other Information: PBD: 1999
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; RADIOACTIVE WASTES; RADIOACTIVE WASTE STORAGE; PROGRAMMING; COMPUTER CODES; BENCH-SCALE EXPERIMENTS; TESTING; THERMAL ANALYSIS; CLAYS
OSTI ID:
20073164
Country of Origin:
Spain
Language:
English
Other Identifying Numbers:
TRN: ES00B0253
Availability:
INIS
Submitting Site:
SPN
Size:
186 pages
Announcement Date:
Mar 17, 2001

Citation Formats

Alonso, E E, and Alcoverro, J. CATSIUS CLAY PROJECT: Calculation and testing of behaviour of unsaturated clay as barrier in radioactive waste repositories: stage 3: validation exercises at a large in situ scale. Spain: N. p., 1999. Web.
Alonso, E E, & Alcoverro, J. CATSIUS CLAY PROJECT: Calculation and testing of behaviour of unsaturated clay as barrier in radioactive waste repositories: stage 3: validation exercises at a large in situ scale. Spain.
Alonso, E E, and Alcoverro, J. 1999. "CATSIUS CLAY PROJECT: Calculation and testing of behaviour of unsaturated clay as barrier in radioactive waste repositories: stage 3: validation exercises at a large in situ scale." Spain.
@misc{etde_20073164,
title = {CATSIUS CLAY PROJECT: Calculation and testing of behaviour of unsaturated clay as barrier in radioactive waste repositories: stage 3: validation exercises at a large in situ scale}
author = {Alonso, E E, and Alcoverro, J}
abstractNote = {Stage 3 of CATSIUS CLAY Project: Validation Exercises at a Large in situ Scale includes two Benchmarks: Benchmark 3.1: In situ Hydration of Boom Clay Pellets (BACCHUS 2) and Benchmark 3.2: FEBEX Mock-up Test. The BACCHUS 2 in situ test was performed in the HADES underground laboratory (Mol, Belgium) to demonstrate and optimize an installation procedure for a clay based material and to study its hydration process. After drilling a vertical shaft (540 mm in diameter, 3.0 m in length) in the host Boom clay, a central filter (90 mm in diameter) was placed, the remaining space was filled with a mixture of clay pellets and clay powder and the assembly was sealed at the upper end by a resin plug (0.20 m in thickness) over which concrete was poured. The test was instrumented so that it could be used as a validation experiment. Total stress, pore water pressure and water content measurements were performed both in the backfill material and in the surrounding clay massif. Once the installation was complete, the natural hydration of the backfill material began (day 0). To accelerate the hydration process, on day 516 water was injected through the central filter. On day 624, after the saturation of the backfill was reached, the hydraulic circuit was closed and the undrained response of the system backfill-host clay was monitored until an overall steady state was reached. Partners were asked to provide predictions for the evolution of the pore water pressure and total pressure of various points where appropriate sensors are installed. This benchmark addresses the Hydro-Mechanical response of an unsaturated low density clay barrier under natural and artificial hydration. (Author)}
place = {Spain}
year = {1999}
month = {Jul}
}