Abstract
Quality pressure boundary maintenance and an excellent loss prevention record at Bruce Heavy Water Plant are the results of the Material and Inspection Unit`s five inspection programs. Experienced inspectors are responsible for the integrity of the pressure boundary in their own operating area. Inspectors are part of the Technical Section, and along with unit engineering staff, they provide technical input before, during, and after the job. How these programs are completed, and the results achieved, are discussed. 5 figs., 1 appendix.
Brown, K C
[1]
- Ontario Hydro, Tiverton, ON (Canada)
Citation Formats
Brown, K C.
Integrated inspection programs at Bruce Heavy Water Plant.
Canada: N. p.,
1992.
Web.
Brown, K C.
Integrated inspection programs at Bruce Heavy Water Plant.
Canada.
Brown, K C.
1992.
"Integrated inspection programs at Bruce Heavy Water Plant."
Canada.
@misc{etde_176420,
title = {Integrated inspection programs at Bruce Heavy Water Plant}
author = {Brown, K C}
abstractNote = {Quality pressure boundary maintenance and an excellent loss prevention record at Bruce Heavy Water Plant are the results of the Material and Inspection Unit`s five inspection programs. Experienced inspectors are responsible for the integrity of the pressure boundary in their own operating area. Inspectors are part of the Technical Section, and along with unit engineering staff, they provide technical input before, during, and after the job. How these programs are completed, and the results achieved, are discussed. 5 figs., 1 appendix.}
place = {Canada}
year = {1992}
month = {Dec}
}
title = {Integrated inspection programs at Bruce Heavy Water Plant}
author = {Brown, K C}
abstractNote = {Quality pressure boundary maintenance and an excellent loss prevention record at Bruce Heavy Water Plant are the results of the Material and Inspection Unit`s five inspection programs. Experienced inspectors are responsible for the integrity of the pressure boundary in their own operating area. Inspectors are part of the Technical Section, and along with unit engineering staff, they provide technical input before, during, and after the job. How these programs are completed, and the results achieved, are discussed. 5 figs., 1 appendix.}
place = {Canada}
year = {1992}
month = {Dec}
}