Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary

Abstract

The Loviisa NPP units were in power operation the whole last quarter, with the exception of a reactor scram at Loviisa 1. The load factor average of all Finnish plant units was 100.2 %. The annual average was 90.0 %. All events in the fourth annual quarter were assigned level 0 (no safety significance) on the international INES scale. Four events in 1994 were classified level 1 (an anomaly). The Finnish Centre for Radiation and Nuclear Safety in December approved Imatran Voima Oy`s application to extend the operation of the reactor pressure vessel of Loviisa 2 until the annual maintenance outage of 2010. During this quarter, a batch of spent fuel from Loviisa power plant was transported to Russia. Occupational doses and radioactive releases off-site were below authorised limits. Only such quantities of plant-based radioactive materials were measurable in samples collected around the plants as have no bearing on the radiation exposure of the population. The report includes a summary of all the items described in the Quarterly Reports of 1994. (8 figs., 4 tabs.).
Authors:
Tossavainen, K [1] 
  1. ed.
Publication Date:
May 01, 1995
Product Type:
Technical Report
Report Number:
STUK-B-YTO-132
Reference Number:
SCA: 210100; 210200; PA: AIX-26:077367; EDB-96:014492; NTS-96:008539; SN: 96001512783
Resource Relation:
Other Information: DN: Published also in Finnish under the report number STUK-B-YTO--126.; PBD: May 1995
Subject:
21 NUCLEAR POWER REACTORS AND ASSOCIATED PLANTS; LOVIISA-1 REACTOR; REACTOR OPERATION; LOVIISA-2 REACTOR; TVO-1 REACTOR; TVO-2 REACTOR; RADIATION PROTECTION
OSTI ID:
158019
Research Organizations:
Finnish Centre for Radiation and Nuclear Safety (STUK), Helsinki (Finland)
Country of Origin:
Finland
Language:
English
Other Identifying Numbers:
Other: ON: DE96606605; ISBN 951-712-045-1; TRN: FI9500106077367
Availability:
INIS; OSTI as DE96606605
Submitting Site:
FIN
Size:
27 p.
Announcement Date:

Citation Formats

Tossavainen, K. Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary. Finland: N. p., 1995. Web.
Tossavainen, K. Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary. Finland.
Tossavainen, K. 1995. "Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary." Finland.
@misc{etde_158019,
title = {Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary}
author = {Tossavainen, K}
abstractNote = {The Loviisa NPP units were in power operation the whole last quarter, with the exception of a reactor scram at Loviisa 1. The load factor average of all Finnish plant units was 100.2 %. The annual average was 90.0 %. All events in the fourth annual quarter were assigned level 0 (no safety significance) on the international INES scale. Four events in 1994 were classified level 1 (an anomaly). The Finnish Centre for Radiation and Nuclear Safety in December approved Imatran Voima Oy`s application to extend the operation of the reactor pressure vessel of Loviisa 2 until the annual maintenance outage of 2010. During this quarter, a batch of spent fuel from Loviisa power plant was transported to Russia. Occupational doses and radioactive releases off-site were below authorised limits. Only such quantities of plant-based radioactive materials were measurable in samples collected around the plants as have no bearing on the radiation exposure of the population. The report includes a summary of all the items described in the Quarterly Reports of 1994. (8 figs., 4 tabs.).}
place = {Finland}
year = {1995}
month = {May}
}