The present work describes the methodology for the cutting of the existing welding and subsequent welding applied by the TIG process of the coupling composed by the shroud ring and the end fitting ring from one of Embalse nuclear power plant`s fuel channels. The replacement will be previously determined by the SLAR-ETTE mechanism where a displacement operated among the Gartner Spring rings, the pressure tubes are separated from the Calandria tubes. The welding to be carried out has the function of stamping the CO{sub 2} annular gas (thermal insulator) circulating between the pressure tube and the Calandria one during the functioning of the plant. (Author). [Espanol] El presente trabajo describe la metodologia de corte de la soldadura existente y la posterior soldadura aplicada mediante proceso TIG de la junta compuesta por el aro de fuelle y el anillo del `end fitting`, de uno de los canales de combustibles del reactor de la Central Nuclear Embalse. El reemplazo, se determinara previamente mediante el mecanismo de SLAR-ETTE con lo cual se observara el desplazamiento operado entre los anillos garten spring que separan los tubos de presion de los tubos de calandria. La soldadura a efectuar cumple la funcion de sellar el gas
More>>
Citation Formats
Suarez, P O.
Welding with the TIG automatic process of the end fittings for the execution of the Embalse nuclear power plant fuel channel rechange; Soldadura con proceso TIG automatico de los accesorios extremos (end fitting) para la ejecucion de un recambio de canal de combustible en el reactor de la Central Nuclear Embalse.
Argentina: N. p.,
1990.
Web.
Suarez, P O.
Welding with the TIG automatic process of the end fittings for the execution of the Embalse nuclear power plant fuel channel rechange; Soldadura con proceso TIG automatico de los accesorios extremos (end fitting) para la ejecucion de un recambio de canal de combustible en el reactor de la Central Nuclear Embalse.
Argentina.
Suarez, P O.
1990.
"Welding with the TIG automatic process of the end fittings for the execution of the Embalse nuclear power plant fuel channel rechange; Soldadura con proceso TIG automatico de los accesorios extremos (end fitting) para la ejecucion de un recambio de canal de combustible en el reactor de la Central Nuclear Embalse."
Argentina.
@misc{etde_10156649,
title = {Welding with the TIG automatic process of the end fittings for the execution of the Embalse nuclear power plant fuel channel rechange; Soldadura con proceso TIG automatico de los accesorios extremos (end fitting) para la ejecucion de un recambio de canal de combustible en el reactor de la Central Nuclear Embalse}
author = {Suarez, P O}
abstractNote = {The present work describes the methodology for the cutting of the existing welding and subsequent welding applied by the TIG process of the coupling composed by the shroud ring and the end fitting ring from one of Embalse nuclear power plant`s fuel channels. The replacement will be previously determined by the SLAR-ETTE mechanism where a displacement operated among the Gartner Spring rings, the pressure tubes are separated from the Calandria tubes. The welding to be carried out has the function of stamping the CO{sub 2} annular gas (thermal insulator) circulating between the pressure tube and the Calandria one during the functioning of the plant. (Author). [Espanol] El presente trabajo describe la metodologia de corte de la soldadura existente y la posterior soldadura aplicada mediante proceso TIG de la junta compuesta por el aro de fuelle y el anillo del `end fitting`, de uno de los canales de combustibles del reactor de la Central Nuclear Embalse. El reemplazo, se determinara previamente mediante el mecanismo de SLAR-ETTE con lo cual se observara el desplazamiento operado entre los anillos garten spring que separan los tubos de presion de los tubos de calandria. La soldadura a efectuar cumple la funcion de sellar el gas anular CO{sub 2} (aislante termico) circulante entre el tubo de presion y el tubo de calandria durante el funcionamiento de la planta. (Autor).}
place = {Argentina}
year = {1990}
month = {Dec}
}
title = {Welding with the TIG automatic process of the end fittings for the execution of the Embalse nuclear power plant fuel channel rechange; Soldadura con proceso TIG automatico de los accesorios extremos (end fitting) para la ejecucion de un recambio de canal de combustible en el reactor de la Central Nuclear Embalse}
author = {Suarez, P O}
abstractNote = {The present work describes the methodology for the cutting of the existing welding and subsequent welding applied by the TIG process of the coupling composed by the shroud ring and the end fitting ring from one of Embalse nuclear power plant`s fuel channels. The replacement will be previously determined by the SLAR-ETTE mechanism where a displacement operated among the Gartner Spring rings, the pressure tubes are separated from the Calandria tubes. The welding to be carried out has the function of stamping the CO{sub 2} annular gas (thermal insulator) circulating between the pressure tube and the Calandria one during the functioning of the plant. (Author). [Espanol] El presente trabajo describe la metodologia de corte de la soldadura existente y la posterior soldadura aplicada mediante proceso TIG de la junta compuesta por el aro de fuelle y el anillo del `end fitting`, de uno de los canales de combustibles del reactor de la Central Nuclear Embalse. El reemplazo, se determinara previamente mediante el mecanismo de SLAR-ETTE con lo cual se observara el desplazamiento operado entre los anillos garten spring que separan los tubos de presion de los tubos de calandria. La soldadura a efectuar cumple la funcion de sellar el gas anular CO{sub 2} (aislante termico) circulante entre el tubo de presion y el tubo de calandria durante el funcionamiento de la planta. (Autor).}