Abstract
Since the SLAC/KEK joint meeting was first held at SLAC in March 1987, we have had such a meeting annually with the present one the 6th. This meeting is planned to discuss the damping ring issue in particular. We have ever stressed the importance of study of damping rings and considered construction of a test damping ring as key issue for the ATF project, since we started construction of the ATF in 1987. In 1991 we had large-scale reconstruction of a building to make a shielded area where a 1.54 GeV injector linac for the ring is to be installed. (J.P.N.).
Citation Formats
Urakawa, J, and Yoshioka, M.
Proceedings of the SLAC/KEK linear collider workshop on damping ring.
Japan: N. p.,
1992.
Web.
Urakawa, J, & Yoshioka, M.
Proceedings of the SLAC/KEK linear collider workshop on damping ring.
Japan.
Urakawa, J, and Yoshioka, M.
1992.
"Proceedings of the SLAC/KEK linear collider workshop on damping ring."
Japan.
@misc{etde_10150573,
title = {Proceedings of the SLAC/KEK linear collider workshop on damping ring}
author = {Urakawa, J, and Yoshioka, M}
abstractNote = {Since the SLAC/KEK joint meeting was first held at SLAC in March 1987, we have had such a meeting annually with the present one the 6th. This meeting is planned to discuss the damping ring issue in particular. We have ever stressed the importance of study of damping rings and considered construction of a test damping ring as key issue for the ATF project, since we started construction of the ATF in 1987. In 1991 we had large-scale reconstruction of a building to make a shielded area where a 1.54 GeV injector linac for the ring is to be installed. (J.P.N.).}
place = {Japan}
year = {1992}
month = {Jul}
}
title = {Proceedings of the SLAC/KEK linear collider workshop on damping ring}
author = {Urakawa, J, and Yoshioka, M}
abstractNote = {Since the SLAC/KEK joint meeting was first held at SLAC in March 1987, we have had such a meeting annually with the present one the 6th. This meeting is planned to discuss the damping ring issue in particular. We have ever stressed the importance of study of damping rings and considered construction of a test damping ring as key issue for the ATF project, since we started construction of the ATF in 1987. In 1991 we had large-scale reconstruction of a building to make a shielded area where a 1.54 GeV injector linac for the ring is to be installed. (J.P.N.).}
place = {Japan}
year = {1992}
month = {Jul}
}