The hospital no 7 is only about 10 years old but there are some improvements to be done if the building envelope and the technical services shall gain an acceptable level from an energy point of view. To improve the building envelope it is suggested that the floors over the basement should be insulated underneath with at least 100 mm hard mineral wool, the roof (floor in the technical room) should be insulated with at least 100 mm of mineral wool, insulation with a waterproof covering should be fitted on the outside of the spandrel panels and all windows should be adjusted and/or repaired, fitted with weather seals and the woodwork treated for weather protection. (au).
Citation Formats
None.
Energy saving, consultancy and training in Latvia. Energy savings in public buildings. Audit of: Hospital no. 7, Riga. Final report.
Denmark: N. p.,
1992.
Web.
None.
Energy saving, consultancy and training in Latvia. Energy savings in public buildings. Audit of: Hospital no. 7, Riga. Final report.
Denmark.
None.
1992.
"Energy saving, consultancy and training in Latvia. Energy savings in public buildings. Audit of: Hospital no. 7, Riga. Final report."
Denmark.
@misc{etde_10148480,
title = {Energy saving, consultancy and training in Latvia. Energy savings in public buildings. Audit of: Hospital no. 7, Riga. Final report}
author = {None}
abstractNote = {The hospital no 7 is only about 10 years old but there are some improvements to be done if the building envelope and the technical services shall gain an acceptable level from an energy point of view. To improve the building envelope it is suggested that the floors over the basement should be insulated underneath with at least 100 mm hard mineral wool, the roof (floor in the technical room) should be insulated with at least 100 mm of mineral wool, insulation with a waterproof covering should be fitted on the outside of the spandrel panels and all windows should be adjusted and/or repaired, fitted with weather seals and the woodwork treated for weather protection. (au).}
place = {Denmark}
year = {1992}
month = {Oct}
}
title = {Energy saving, consultancy and training in Latvia. Energy savings in public buildings. Audit of: Hospital no. 7, Riga. Final report}
author = {None}
abstractNote = {The hospital no 7 is only about 10 years old but there are some improvements to be done if the building envelope and the technical services shall gain an acceptable level from an energy point of view. To improve the building envelope it is suggested that the floors over the basement should be insulated underneath with at least 100 mm hard mineral wool, the roof (floor in the technical room) should be insulated with at least 100 mm of mineral wool, insulation with a waterproof covering should be fitted on the outside of the spandrel panels and all windows should be adjusted and/or repaired, fitted with weather seals and the woodwork treated for weather protection. (au).}
place = {Denmark}
year = {1992}
month = {Oct}
}