River Wyre preliminary feasibility study. Tidal energy barrage and road crossing. Final report

Abstract

A study undertaken in 1987 for the Department of Energy, of small estuaries and embayments around the coast of the United Kingdom, identified the Wyre as one of the most promising sites for the construction of a small tidal power barrage. Enquiries showed that Organisations with interests in and around the Wyre had carried out extensive surveys and investigations into the physical and environmental aspects of the estuary, many of which would be relevant to the development of a tidal power scheme. It was identified that a barrage constructed on the Wyre, in addition to generating clean renewable energy may also act as a road crossing between Fleetwood and Over Wyre, thereby avoiding the present diversion via the Shard Toll Bridge located some 8km upstream of the town of Fleetwood. (Author).
Publication Date:
Dec 31, 1991
Product Type:
Technical Report
Report Number:
ETSU-TID-4100
Reference Number:
SCA: 160700; 160500; 160100; PA: GB-92:051314; SN: 92000752524
Resource Relation:
Other Information: PBD: 1991
Subject:
16 TIDAL AND WAVE POWER; TIDAL POWER PLANTS; FEASIBILITY STUDIES; UNITED KINGDOM; ROADS; RIVERS; TIDAL POWER; LOCAL GOVERNMENT; DESIGN; ESTUARIES; CONSTRUCTION; ENVIRONMENTAL IMPACTS; HYDROELECTRIC POWER PLANTS; REGIONAL ANALYSIS; ECONOMIC ANALYSIS; COST ESTIMATION; 160700; 160500; 160100; ENVIRONMENTAL ASPECTS; RESOURCES AND AVAILABILITY
OSTI ID:
10147249
Research Organizations:
T H Technology Ltd., Croydon (United Kingdom); Binnie and Partners, London (United Kingdom)
Country of Origin:
United Kingdom
Language:
English
Other Identifying Numbers:
Other: ON: DE92524713; TRN: GB9251314
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
GB
Size:
385 p.
Announcement Date:
Jul 05, 2005

Citation Formats

None. River Wyre preliminary feasibility study. Tidal energy barrage and road crossing. Final report. United Kingdom: N. p., 1991. Web.
None. River Wyre preliminary feasibility study. Tidal energy barrage and road crossing. Final report. United Kingdom.
None. 1991. "River Wyre preliminary feasibility study. Tidal energy barrage and road crossing. Final report." United Kingdom.
@misc{etde_10147249,
title = {River Wyre preliminary feasibility study. Tidal energy barrage and road crossing. Final report}
author = {None}
abstractNote = {A study undertaken in 1987 for the Department of Energy, of small estuaries and embayments around the coast of the United Kingdom, identified the Wyre as one of the most promising sites for the construction of a small tidal power barrage. Enquiries showed that Organisations with interests in and around the Wyre had carried out extensive surveys and investigations into the physical and environmental aspects of the estuary, many of which would be relevant to the development of a tidal power scheme. It was identified that a barrage constructed on the Wyre, in addition to generating clean renewable energy may also act as a road crossing between Fleetwood and Over Wyre, thereby avoiding the present diversion via the Shard Toll Bridge located some 8km upstream of the town of Fleetwood. (Author).}
place = {United Kingdom}
year = {1991}
month = {Dec}
}