You need JavaScript to view this

Drilling surveillance and geomechanical experiments in deep boreholes in salt

Abstract

In the framework of the CEC Programme on Radioactive Waste Disposal (1985-1990), in situ experiments in the Asse II salt mine in Germany are conducted. This report describes the work of the 600 m borehole project performed during the contracting period August 1986 - December 1990. During this period measurement devices for measurement of rock mechanical parameters have been developed and were made operational. For the drilling of the boreholes a new technique has been developed. One main subject of investigation was to develop an on-line method to determine the gas content in the flushing air during drilling operation. The method used worked satisfactorily and the test showed that this surveillance method could be used during dry-drilling of deep emplacement boreholes in a future repository. For the second experiment the Variable Pressure Device (VPD) has been constructed to measure the elastic and time-dependent response of the salt on pressure changes. 37 refs., 49 figs., 5 tabs.
Authors:
Hamilton, L F.M.; Prij, J; [1]  Jockwer, N [2] 
  1. Netherlands Energy Research Foundation (ECN), Petten (Netherlands)
  2. Gesellschaft fuer Strahlen- und Umweltforschung mbH Muenchen, Braunschweig (Germany). Inst. fuer Tieflagerung
Publication Date:
May 01, 1993
Product Type:
Technical Report
Report Number:
EUR-14235
Reference Number:
SCA: 052002; PA: AIX-24:036306; SN: 93000977157
Resource Relation:
Other Information: PBD: 1993
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; ASSE SALT MINE; RADIOACTIVE WASTE DISPOSAL; DISPOSAL WELLS; MWD SYSTEMS; GAS ANALYSIS; PRESSURE MEASUREMENT; CARBON DIOXIDE; CUTTING; EXPERIMENTAL DATA; FIELD TESTS; GAS CHROMATOGRAPHY; HYDROGEN SULFIDES; MECHANICAL TESTS; METHANE; ON-LINE MEASUREMENT SYSTEMS; QUANTITATIVE CHEMICAL ANALYSIS; UNDERGROUND DISPOSAL; 052002; WASTE DISPOSAL AND STORAGE
OSTI ID:
10144695
Research Organizations:
Commission of the European Communities, Luxembourg (Luxembourg)
Country of Origin:
CEC
Language:
English
Other Identifying Numbers:
Other: ON: TI93622719; CNN: Contract Fl1W/0084; TRN: XE9300014036306
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
INIS
Size:
[114] p.
Announcement Date:
Jul 05, 2005

Citation Formats

Hamilton, L F.M., Prij, J, and Jockwer, N. Drilling surveillance and geomechanical experiments in deep boreholes in salt. CEC: N. p., 1993. Web.
Hamilton, L F.M., Prij, J, & Jockwer, N. Drilling surveillance and geomechanical experiments in deep boreholes in salt. CEC.
Hamilton, L F.M., Prij, J, and Jockwer, N. 1993. "Drilling surveillance and geomechanical experiments in deep boreholes in salt." CEC.
@misc{etde_10144695,
title = {Drilling surveillance and geomechanical experiments in deep boreholes in salt}
author = {Hamilton, L F.M., Prij, J, and Jockwer, N}
abstractNote = {In the framework of the CEC Programme on Radioactive Waste Disposal (1985-1990), in situ experiments in the Asse II salt mine in Germany are conducted. This report describes the work of the 600 m borehole project performed during the contracting period August 1986 - December 1990. During this period measurement devices for measurement of rock mechanical parameters have been developed and were made operational. For the drilling of the boreholes a new technique has been developed. One main subject of investigation was to develop an on-line method to determine the gas content in the flushing air during drilling operation. The method used worked satisfactorily and the test showed that this surveillance method could be used during dry-drilling of deep emplacement boreholes in a future repository. For the second experiment the Variable Pressure Device (VPD) has been constructed to measure the elastic and time-dependent response of the salt on pressure changes. 37 refs., 49 figs., 5 tabs.}
place = {CEC}
year = {1993}
month = {May}
}