Abstract

The aim of the project was to produce a 500 kW grid connected wind turbine that would have an operational economy at the same level as smaller 100-200 kW wind turbines. It was attempted to find untraditional solutions for some of the measurement tasks. The prototype wind turbine produced 1,315 MWh during the first year of operation. The calculated nominal annual production of a wind turbine in roughness class 1 is otherwise 1,286 MWh. The simple construction of the prototype makes it suitable for local production. The design of this wind turbine, its control system, safety systems, location, construction and cost are described in detail in addition to the air brake test performed, and the measurement system. (AB)
Publication Date:
Oct 01, 1993
Product Type:
Technical Report
Report Number:
NEI-DK-1782
Reference Number:
SCA: 170602; PA: DK-94:001179; EDB-94:062524; NTS-94:013509; SN: 94001180389
Resource Relation:
Other Information: PBD: Oct 1993
Subject:
17 WIND ENERGY; HORIZONTAL AXIS TURBINES; CAPACITY; DESIGN; CONSTRUCTION; EXPERIMENTAL DATA; PERFORMANCE TESTING; DENMARK; COST; ELECTRIC POWER; MEASURING METHODS; BRAKES; SAFETY; CONTROL EQUIPMENT; CALIBRATION; RECORDING SYSTEMS; 170602; TURBINE DESIGN AND OPERATION
OSTI ID:
10141362
Research Organizations:
Nordvestjysk Folkecenter for Vedvarende Energi, Hurup (Denmark)
Country of Origin:
Denmark
Language:
English
Other Identifying Numbers:
Other: ON: DE94756720; CNN: Contract EN3W-0071-DK; ISBN 87-7778-044-2; TRN: DK9401179
Availability:
OSTI; NTIS
Submitting Site:
DK
Size:
208 p.
Announcement Date:
Jul 05, 2005

Citation Formats

Vilsboell, N, Kunwald, P, Reino, A, and Holm, J. Final report on development and building of DANmark 36, 525 kW wind turbine situated in Hanstholm. Denmark: N. p., 1993. Web.
Vilsboell, N, Kunwald, P, Reino, A, & Holm, J. Final report on development and building of DANmark 36, 525 kW wind turbine situated in Hanstholm. Denmark.
Vilsboell, N, Kunwald, P, Reino, A, and Holm, J. 1993. "Final report on development and building of DANmark 36, 525 kW wind turbine situated in Hanstholm." Denmark.
@misc{etde_10141362,
title = {Final report on development and building of DANmark 36, 525 kW wind turbine situated in Hanstholm}
author = {Vilsboell, N, Kunwald, P, Reino, A, and Holm, J}
abstractNote = {The aim of the project was to produce a 500 kW grid connected wind turbine that would have an operational economy at the same level as smaller 100-200 kW wind turbines. It was attempted to find untraditional solutions for some of the measurement tasks. The prototype wind turbine produced 1,315 MWh during the first year of operation. The calculated nominal annual production of a wind turbine in roughness class 1 is otherwise 1,286 MWh. The simple construction of the prototype makes it suitable for local production. The design of this wind turbine, its control system, safety systems, location, construction and cost are described in detail in addition to the air brake test performed, and the measurement system. (AB)}
place = {Denmark}
year = {1993}
month = {Oct}
}