Performance of 420 kV circuit-breakers in HVDC converter station

Abstract

Switching of filter banks can have a severe impact on circuit breaker requirements and performances, due to the high harmonic content in the current to be interrupted and to the distortion of the transient recovery voltage. Attention must be paid to some particular operations which are likely to cause stresses exceeding the figures stated by present standards and have to be analyzed in detail. In some cases, these stresses could determine the number of breaking units of the circuit breaker better than other system requirements like rated short circuit breaking capability, short line fault, etc. The situation can also be more complicated if the circuit-breaker has to be subjected to stresses coming from conversion transformers and harmonic filters switching. The paper presents the results of extensive studies to establish the worst stresses applied to the circuit breaker for SACOI 2 HVDC link between Sardinia and mainland Italy through Corsica. Moreover, the testing activities carried out to verify the ability of the circuit-breaker to withstand the above mentioned stresses are also presented. The peculiarity of these stresses required the setting up of a suitable test circuit to verify the performance of the circuit breaker.
Publication Date:
Jan 01, 1992
Product Type:
Conference
Report Number:
ETDE-IT-93-97; CONF-9209312-2
Reference Number:
SCA: 240202; 240400; PA: ITA-93:000207; SN: 93000966990
Resource Relation:
Conference: CIGRE general session,Paris (France),Sep 1992; Other Information: PBD: Jan 1992
Subject:
24 POWER TRANSMISSION AND DISTRIBUTION; CIRCUIT BREAKERS; PERFORMANCE TESTING; ITALY; FRANCE; INTERCONNECTED POWER SYSTEMS; UNDERWATER FACILITIES; HVDC SYSTEMS; POWER SUBSTATIONS; RELIABILITY; HARMONICS; SWITCHING CIRCUITS; 240202; 240400; DC SYSTEMS; HEALTH AND SAFETY
OSTI ID:
10139435
Research Organizations:
Ente Nazionale per l`Energia Elettrica, Florence (Italy); Centro Elettrotecnico Sperimentale Italiano (CESI), Milan (Italy)
Country of Origin:
Italy
Language:
English
Other Identifying Numbers:
Other: ON: DE93778087; TRN: 93:000207
Availability:
OSTI; NTIS (US Sales Only)
Submitting Site:
ITA
Size:
10 p.
Announcement Date:
Jul 05, 2005

Citation Formats

Aldrovandi, G, Bargigia, A, Bonfanti, I, Pazienza, G, Pincella, C, and Polesello, P. Performance of 420 kV circuit-breakers in HVDC converter station. Italy: N. p., 1992. Web.
Aldrovandi, G, Bargigia, A, Bonfanti, I, Pazienza, G, Pincella, C, & Polesello, P. Performance of 420 kV circuit-breakers in HVDC converter station. Italy.
Aldrovandi, G, Bargigia, A, Bonfanti, I, Pazienza, G, Pincella, C, and Polesello, P. 1992. "Performance of 420 kV circuit-breakers in HVDC converter station." Italy.
@misc{etde_10139435,
title = {Performance of 420 kV circuit-breakers in HVDC converter station}
author = {Aldrovandi, G, Bargigia, A, Bonfanti, I, Pazienza, G, Pincella, C, and Polesello, P}
abstractNote = {Switching of filter banks can have a severe impact on circuit breaker requirements and performances, due to the high harmonic content in the current to be interrupted and to the distortion of the transient recovery voltage. Attention must be paid to some particular operations which are likely to cause stresses exceeding the figures stated by present standards and have to be analyzed in detail. In some cases, these stresses could determine the number of breaking units of the circuit breaker better than other system requirements like rated short circuit breaking capability, short line fault, etc. The situation can also be more complicated if the circuit-breaker has to be subjected to stresses coming from conversion transformers and harmonic filters switching. The paper presents the results of extensive studies to establish the worst stresses applied to the circuit breaker for SACOI 2 HVDC link between Sardinia and mainland Italy through Corsica. Moreover, the testing activities carried out to verify the ability of the circuit-breaker to withstand the above mentioned stresses are also presented. The peculiarity of these stresses required the setting up of a suitable test circuit to verify the performance of the circuit breaker.}
place = {Italy}
year = {1992}
month = {Jan}
}