Abstract
To provide equipment and information sufficient to accomplish a safe system for the homogenisation, physical and chemical conditioning, metering, immobilisation, capping, lid and cap welding and surface contamination monitoring of Steam Generating Heavy Water Moderated Reactor (SGHWR) sludges. Sludges shall be metered into stainless steel 500 litre drums, once completed the drummed waste shall be contained within a shielding overpack for transport across site to the Treated Radwaste Store (TRS). (author).
Citation Formats
Staples, A T.
Customer requirement specification for the sludge homogenisation and immobilisation plant.
United Kingdom: N. p.,
1992.
Web.
Staples, A T.
Customer requirement specification for the sludge homogenisation and immobilisation plant.
United Kingdom.
Staples, A T.
1992.
"Customer requirement specification for the sludge homogenisation and immobilisation plant."
United Kingdom.
@misc{etde_10138466,
title = {Customer requirement specification for the sludge homogenisation and immobilisation plant}
author = {Staples, A T}
abstractNote = {To provide equipment and information sufficient to accomplish a safe system for the homogenisation, physical and chemical conditioning, metering, immobilisation, capping, lid and cap welding and surface contamination monitoring of Steam Generating Heavy Water Moderated Reactor (SGHWR) sludges. Sludges shall be metered into stainless steel 500 litre drums, once completed the drummed waste shall be contained within a shielding overpack for transport across site to the Treated Radwaste Store (TRS). (author).}
place = {United Kingdom}
year = {1992}
month = {May}
}
title = {Customer requirement specification for the sludge homogenisation and immobilisation plant}
author = {Staples, A T}
abstractNote = {To provide equipment and information sufficient to accomplish a safe system for the homogenisation, physical and chemical conditioning, metering, immobilisation, capping, lid and cap welding and surface contamination monitoring of Steam Generating Heavy Water Moderated Reactor (SGHWR) sludges. Sludges shall be metered into stainless steel 500 litre drums, once completed the drummed waste shall be contained within a shielding overpack for transport across site to the Treated Radwaste Store (TRS). (author).}
place = {United Kingdom}
year = {1992}
month = {May}
}