Operational readiness of filtered air discharge monitoring systems

Abstract

An assessment of the operational readiness of the Filtered Air Discharge (FAD) Stack Monitoring systems, installed in Canadian CANDU nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on FAD stack monitoring system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of FAD stack monitoring systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for design and performance review guidelines for CANDU stations. A case study of the FAD stack monitoring system at Pickering NGS is also documented in this report.
Publication Date:
Aug 01, 1993
Product Type:
Technical Report
Report Number:
INFO-0447
Reference Number:
SCA: 210400; PA: AIX-25:026015; EDB-94:051610; NTS-94:016686; SN: 94001175003
Resource Relation:
Other Information: PBD: Aug 1993
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; AIR SAMPLERS; PERFORMANCE TESTING; ACCIDENTS; AIR FILTERS; CANDU TYPE REACTORS; EARTH ATMOSPHERE; RADIATION MONITORING; RADIATION MONITORS; RELIABILITY; STACKS; SYSTEMS ANALYSIS; 210400; POWER REACTORS, NONBREEDING, OTHERWISE MODERATED OR UNMODERATED
OSTI ID:
10138449
Research Organizations:
Atomic Energy Control Board, Ottawa, ON (Canada)
Country of Origin:
Canada
Language:
English
Other Identifying Numbers:
Other: ON: DE94619679; TRN: CA9400216026015
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
INIS
Size:
58 p.
Announcement Date:
Jul 05, 2005

Citation Formats

Lafortune, J F, and Jamieson, T J. Operational readiness of filtered air discharge monitoring systems. Canada: N. p., 1993. Web.
Lafortune, J F, & Jamieson, T J. Operational readiness of filtered air discharge monitoring systems. Canada.
Lafortune, J F, and Jamieson, T J. 1993. "Operational readiness of filtered air discharge monitoring systems." Canada.
@misc{etde_10138449,
title = {Operational readiness of filtered air discharge monitoring systems}
author = {Lafortune, J F, and Jamieson, T J}
abstractNote = {An assessment of the operational readiness of the Filtered Air Discharge (FAD) Stack Monitoring systems, installed in Canadian CANDU nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on FAD stack monitoring system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of FAD stack monitoring systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for design and performance review guidelines for CANDU stations. A case study of the FAD stack monitoring system at Pickering NGS is also documented in this report.}
place = {Canada}
year = {1993}
month = {Aug}
}