Abstract
The superconducting relativistic heavy ion accelerator was commissioned the last week of March in Dubna, and the first deuteron beam was circulated in the ring. The total cold mass of the magnetic system is about 80 tons. The magnet with a `cold` iron yoke and a hollow superconductor winding is refrigerated by a two-phase helium flow. All 160 magnets are connected in parallel with supply and return helium headers about 250 meters long. The cryogenic supply system is based on three helium refrigerators with a total capacity of 4.8 kW at 4.5 K. The results on the commissioning of the cryogenic system are presented. 11 refs.; 5 figs.; 1 tab.
Citation Formats
Baldin, A M, Agapov, N N, and Belushkin, V A.
Cryogenic system of the nuclotron - a new superconducting synchrotron.
JINR: N. p.,
1993.
Web.
Baldin, A M, Agapov, N N, & Belushkin, V A.
Cryogenic system of the nuclotron - a new superconducting synchrotron.
JINR.
Baldin, A M, Agapov, N N, and Belushkin, V A.
1993.
"Cryogenic system of the nuclotron - a new superconducting synchrotron."
JINR.
@misc{etde_10136813,
title = {Cryogenic system of the nuclotron - a new superconducting synchrotron}
author = {Baldin, A M, Agapov, N N, and Belushkin, V A}
abstractNote = {The superconducting relativistic heavy ion accelerator was commissioned the last week of March in Dubna, and the first deuteron beam was circulated in the ring. The total cold mass of the magnetic system is about 80 tons. The magnet with a `cold` iron yoke and a hollow superconductor winding is refrigerated by a two-phase helium flow. All 160 magnets are connected in parallel with supply and return helium headers about 250 meters long. The cryogenic supply system is based on three helium refrigerators with a total capacity of 4.8 kW at 4.5 K. The results on the commissioning of the cryogenic system are presented. 11 refs.; 5 figs.; 1 tab.}
place = {JINR}
year = {1993}
month = {Dec}
}
title = {Cryogenic system of the nuclotron - a new superconducting synchrotron}
author = {Baldin, A M, Agapov, N N, and Belushkin, V A}
abstractNote = {The superconducting relativistic heavy ion accelerator was commissioned the last week of March in Dubna, and the first deuteron beam was circulated in the ring. The total cold mass of the magnetic system is about 80 tons. The magnet with a `cold` iron yoke and a hollow superconductor winding is refrigerated by a two-phase helium flow. All 160 magnets are connected in parallel with supply and return helium headers about 250 meters long. The cryogenic supply system is based on three helium refrigerators with a total capacity of 4.8 kW at 4.5 K. The results on the commissioning of the cryogenic system are presented. 11 refs.; 5 figs.; 1 tab.}