Kernkraftwerk Obrigheim (KWO) GmbH. Annual report 1991; Kernkraftwerk Obrigheim (KWO) GmbH. Jahresbericht 1991

Abstract

The Obrigheim nuclear power station was operated at full load from August 21 through Dec. 31, 1991, generating 1.108 GWh of electrical energy in 3.186 operating hours. The Obrigheim nuclear power station thus achieved during this period of 133 days in 1991 an operating availability of 100%. Since its commissioning in October 1968, the Obrigheim reactor station has been operating for 161.527 hours, generating 54.409 GWh (gross), and from test operation started in March 1969 up to the end of 1991, all in all 54.284 GWh have been generated in 160.747 operating hours, which means an availability time ratio of 78.2%, and a capacity factor of 80.4%. The plant was shut down in 1991 for the 21st refuelling operation including inspection and repair work, for a fictitious period of 1783 hours. In addition, power operation was stopped by an order of the supervisory authority for another 3.791 hours, so that the plant remained disconnected from the grid between Januar 1 and August 8, 1991. In the last part of the year 1991, until May 26, the plant had an excellent availability time ratio and thus contributed about 2.5% of the safe, economic and environmentally sound electricity supplies in Baden-Wuerttemberg. (orig.).  More>>
Authors:
Koerner, C [1] 
  1. comp.
Publication Date:
Dec 31, 1992
Product Type:
Miscellaneous
Report Number:
INIS-mf-14124
Reference Number:
SCA: 210200; 210800; PA: DEN-93:002568; SN: 93000953197
Resource Relation:
Other Information: PBD: 1992
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; OBRIGHEIM REACTOR; REACTOR OPERATION; POWER GENERATION; AVAILABILITY; REACTOR FUELING; REACTOR SHUTDOWN; OPERATING LICENSES; STATE GOVERNMENT; PROGRESS REPORT; COMPILED DATA; LEGAL ASPECTS; 210200; 210800; POWER REACTORS, NONBREEDING, LIGHT-WATER MODERATED, NONBOILING WATER COOLED; ECONOMICS
OSTI ID:
10132465
Research Organizations:
Kernkraftwerk Obrigheim GmbH (Germany)
Country of Origin:
Germany
Language:
German
Other Identifying Numbers:
Other: ON: DE93771916; TRN: DE9302568
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
DEN
Size:
82 p.
Announcement Date:
Jul 04, 2005

Citation Formats

Koerner, C. Kernkraftwerk Obrigheim (KWO) GmbH. Annual report 1991; Kernkraftwerk Obrigheim (KWO) GmbH. Jahresbericht 1991. Germany: N. p., 1992. Web.
Koerner, C. Kernkraftwerk Obrigheim (KWO) GmbH. Annual report 1991; Kernkraftwerk Obrigheim (KWO) GmbH. Jahresbericht 1991. Germany.
Koerner, C. 1992. "Kernkraftwerk Obrigheim (KWO) GmbH. Annual report 1991; Kernkraftwerk Obrigheim (KWO) GmbH. Jahresbericht 1991." Germany.
@misc{etde_10132465,
title = {Kernkraftwerk Obrigheim (KWO) GmbH. Annual report 1991; Kernkraftwerk Obrigheim (KWO) GmbH. Jahresbericht 1991}
author = {Koerner, C}
abstractNote = {The Obrigheim nuclear power station was operated at full load from August 21 through Dec. 31, 1991, generating 1.108 GWh of electrical energy in 3.186 operating hours. The Obrigheim nuclear power station thus achieved during this period of 133 days in 1991 an operating availability of 100%. Since its commissioning in October 1968, the Obrigheim reactor station has been operating for 161.527 hours, generating 54.409 GWh (gross), and from test operation started in March 1969 up to the end of 1991, all in all 54.284 GWh have been generated in 160.747 operating hours, which means an availability time ratio of 78.2%, and a capacity factor of 80.4%. The plant was shut down in 1991 for the 21st refuelling operation including inspection and repair work, for a fictitious period of 1783 hours. In addition, power operation was stopped by an order of the supervisory authority for another 3.791 hours, so that the plant remained disconnected from the grid between Januar 1 and August 8, 1991. In the last part of the year 1991, until May 26, the plant had an excellent availability time ratio and thus contributed about 2.5% of the safe, economic and environmentally sound electricity supplies in Baden-Wuerttemberg. (orig.). [Deutsch] Obrigheim wurde im Jahr 1991 vom 21. August bis zum 31. Dezember durchgehend mit Vollast gefahren. Erzeugt wurde in 3.186 Betriebsstunden eine elektrische Energie von 1.108 GWh. Damit war die KWO in den letzten 133 Tagen des Jahres 1991 praktisch mit 100% Zeitverfuegbarkeit am Netz. Seit der Inbetriebnahme im Oktober 1968 wurden in 161.527 Betriebsstunden 54.409 GWh (brutto) erzeugt. Seit dem Probebetrieb im Maerz 1969 bis Ende 1991 waren es in 160.747 Betriebsstunden 54.284 GWh, das ergibt fuer diesen Zeitraum eine Arbeitsausnutzung von 78,2% und eine Zeitverfuegbarkeit von 80,4%. Im Jahre 1991 wurde die Anlage zum 21. Brennelementwechsel einschliesslich Revisions-, Inspektions- und Reparaturarbeiten fiktiv fuer 1783 Stunden abgeschaltet. Ausserdem wurde der Leistungsbetrieb durch behoerdliche Anordnung im Jahre 1991 fuer weitere 3.791 Stunden ausgesetzt. Die Anlage war damit zwischen dem 1.1. und 20.8. nicht am Netz. Ausserhalb dieses Zeitraumes wies die Anlage eine ausgezeichnete zeitliche Verfuegbarkeit auf und trug damit 1991 zur sicheren, wirtschaftlichen und umweltfreundlichen Elektrizitaetsversorgung Baden-Wuerttembergs mit etwa 2,5% bei. (orig.).}
place = {Germany}
year = {1992}
month = {Dec}
}