You need JavaScript to view this

Photovoltaic energy cost limit; Limite di costo dell`energia fotovoltaica

Abstract

Referring to a photovoltaic system for grid connected applications, a parametric expression of kWh cost is derived. The limit of kWh cost is carried out extrapolating the values of cost components to their lowest figure. The reliability of the forecast is checked by disaggregating kWh cost in direct and indirect costs and by discussing the possible cost reduction of each component.
Authors:
Publication Date:
Dec 31, 1992
Product Type:
Technical Report
Report Number:
ENEA-RT-ENERG-91-03; RT/ENERG-91-03
Reference Number:
SCA: 140300; PA: ITA-93:000173; SN: 93000947356
Resource Relation:
Other Information: PBD: 1992
Subject:
14 SOLAR ENERGY; PHOTOVOLTAIC POWER PLANTS; COST ESTIMATION; ACCURACY; INTERCONNECTED POWER SYSTEMS; ECONOMICS; 140300; ECONOMIC, INDUSTRIAL, AND BUSINESS ASPECTS
OSTI ID:
10128948
Research Organizations:
ENEA, Casaccia (Italy). Area Energetica
Country of Origin:
Italy
Language:
Italian
Other Identifying Numbers:
Journal ID: ISSN 1120-5563; Other: ON: DE93769370; TRN: 93:000173
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
ITA
Size:
31 p.
Announcement Date:
Jul 04, 2005

Citation Formats

Coiante, D. Photovoltaic energy cost limit; Limite di costo dell`energia fotovoltaica. Italy: N. p., 1992. Web.
Coiante, D. Photovoltaic energy cost limit; Limite di costo dell`energia fotovoltaica. Italy.
Coiante, D. 1992. "Photovoltaic energy cost limit; Limite di costo dell`energia fotovoltaica." Italy.
@misc{etde_10128948,
title = {Photovoltaic energy cost limit; Limite di costo dell`energia fotovoltaica}
author = {Coiante, D}
abstractNote = {Referring to a photovoltaic system for grid connected applications, a parametric expression of kWh cost is derived. The limit of kWh cost is carried out extrapolating the values of cost components to their lowest figure. The reliability of the forecast is checked by disaggregating kWh cost in direct and indirect costs and by discussing the possible cost reduction of each component.}
place = {Italy}
year = {1992}
month = {Dec}
}