The period 91-92 has seen reliability of the machine sub-units improve, for example cryogenics got at an excellent level. Efforts have been made on data-processing and on the first wall. Hybrid installation has reached its rated power with 6 MW (mega Watts) injected in the Tore, at the ionic cyclotronic frequency 4 MW (mega Watts) have been coupled to the plasma with an only one launcher, more-over one has realized the injection of 1.7 MW of neutral deuterium. Efforts towards long discharge allowed obtaining an one minute long discharge at 10{sup 6} amperes with the coupling of 170 MJ (mega joules) hybrid waves to the plasma. Preliminary plan `continuous Tore Supra` is discussed as also last views about basic machine technology with components, magnets, tritium, without forgetting long term technology including solid blanket, liquid blanket and low activation materials. 60 figs., 340 refs.
Citation Formats
None.
Progress report 1991-1992; Rapport d`activite 1991-1992.
France: N. p.,
1993.
Web.
None.
Progress report 1991-1992; Rapport d`activite 1991-1992.
France.
None.
1993.
"Progress report 1991-1992; Rapport d`activite 1991-1992."
France.
@misc{etde_10128020,
title = {Progress report 1991-1992; Rapport d`activite 1991-1992}
author = {None}
abstractNote = {The period 91-92 has seen reliability of the machine sub-units improve, for example cryogenics got at an excellent level. Efforts have been made on data-processing and on the first wall. Hybrid installation has reached its rated power with 6 MW (mega Watts) injected in the Tore, at the ionic cyclotronic frequency 4 MW (mega Watts) have been coupled to the plasma with an only one launcher, more-over one has realized the injection of 1.7 MW of neutral deuterium. Efforts towards long discharge allowed obtaining an one minute long discharge at 10{sup 6} amperes with the coupling of 170 MJ (mega joules) hybrid waves to the plasma. Preliminary plan `continuous Tore Supra` is discussed as also last views about basic machine technology with components, magnets, tritium, without forgetting long term technology including solid blanket, liquid blanket and low activation materials. 60 figs., 340 refs.}
place = {France}
year = {1993}
month = {Dec}
}
title = {Progress report 1991-1992; Rapport d`activite 1991-1992}
author = {None}
abstractNote = {The period 91-92 has seen reliability of the machine sub-units improve, for example cryogenics got at an excellent level. Efforts have been made on data-processing and on the first wall. Hybrid installation has reached its rated power with 6 MW (mega Watts) injected in the Tore, at the ionic cyclotronic frequency 4 MW (mega Watts) have been coupled to the plasma with an only one launcher, more-over one has realized the injection of 1.7 MW of neutral deuterium. Efforts towards long discharge allowed obtaining an one minute long discharge at 10{sup 6} amperes with the coupling of 170 MJ (mega joules) hybrid waves to the plasma. Preliminary plan `continuous Tore Supra` is discussed as also last views about basic machine technology with components, magnets, tritium, without forgetting long term technology including solid blanket, liquid blanket and low activation materials. 60 figs., 340 refs.}
place = {France}
year = {1993}
month = {Dec}
}