Abstract
The AECB Pickering project staff, in cooperation with AECB staff in Ottawa, monitor the operation of Pickering NGS-A units 1-4 and Pickering NGS-B units 5-8 to ensure that Ontario Hydro operates the station in compliance with the licensing and safety requirements of the Atomic Energy Control Board. This report presents the review of licensing issues and station performance during 1991. Improvement over 1990 station operation occurred in the following areas: availability of special safety systems; reduction of the station external dose; reorganization of station management to improve focus; station chemistry; housekeeping and material condition; fuel handling capability; training of operators and maintenance staff. However, little change occurred and improvement is still needed in the following: compliance with operating licence; system surveillance program; station maintenance; environmental qualification; radiation emergency response; fire and rescue emergency response; limited capability to predict and prevent equipment failures such as the boiler tube failure on unit 5. (L.L.).
Citation Formats
None.
AECB staff annual report of Pickering NGS for the year 1991.
Canada: N. p.,
1992.
Web.
None.
AECB staff annual report of Pickering NGS for the year 1991.
Canada.
None.
1992.
"AECB staff annual report of Pickering NGS for the year 1991."
Canada.
@misc{etde_10127200,
title = {AECB staff annual report of Pickering NGS for the year 1991}
author = {None}
abstractNote = {The AECB Pickering project staff, in cooperation with AECB staff in Ottawa, monitor the operation of Pickering NGS-A units 1-4 and Pickering NGS-B units 5-8 to ensure that Ontario Hydro operates the station in compliance with the licensing and safety requirements of the Atomic Energy Control Board. This report presents the review of licensing issues and station performance during 1991. Improvement over 1990 station operation occurred in the following areas: availability of special safety systems; reduction of the station external dose; reorganization of station management to improve focus; station chemistry; housekeeping and material condition; fuel handling capability; training of operators and maintenance staff. However, little change occurred and improvement is still needed in the following: compliance with operating licence; system surveillance program; station maintenance; environmental qualification; radiation emergency response; fire and rescue emergency response; limited capability to predict and prevent equipment failures such as the boiler tube failure on unit 5. (L.L.).}
place = {Canada}
year = {1992}
month = {Nov}
}
title = {AECB staff annual report of Pickering NGS for the year 1991}
author = {None}
abstractNote = {The AECB Pickering project staff, in cooperation with AECB staff in Ottawa, monitor the operation of Pickering NGS-A units 1-4 and Pickering NGS-B units 5-8 to ensure that Ontario Hydro operates the station in compliance with the licensing and safety requirements of the Atomic Energy Control Board. This report presents the review of licensing issues and station performance during 1991. Improvement over 1990 station operation occurred in the following areas: availability of special safety systems; reduction of the station external dose; reorganization of station management to improve focus; station chemistry; housekeeping and material condition; fuel handling capability; training of operators and maintenance staff. However, little change occurred and improvement is still needed in the following: compliance with operating licence; system surveillance program; station maintenance; environmental qualification; radiation emergency response; fire and rescue emergency response; limited capability to predict and prevent equipment failures such as the boiler tube failure on unit 5. (L.L.).}