You need JavaScript to view this

LOBI test BT-15/BT-16 pre-test calculation

Abstract

LOBI is a higher pressure, electrically heated integral system facility simulating a KWU 1300 MW PWR scaled 1:712 by volume, although full scale has been maintained in the vertical direction. In order to complete the test programme before the facility is closed in 1991 a number of tests have been performed in tandem, where the test procedures were compatible. BT-15/BT-16 is one such composite test. In their original form both tests BT-15 and BT-16 simulated a loss of main feedwater transient with delayed auxiliary feedwater injection, with the pumps running in BT-15 and tripped in BT-16. The aim of each test was to investigate the loss of primary/secondary heat transfer as the steam generator secondary sides boiled down, and the subsequent recovery of heat transfer as the auxiliary feedwater was tripped on. Due to a re-scheduling of the test programme there was insufficient time to perform sensitivity studies and so only one, base case, calculation is presented. (author).
Authors:
Holmes, B J [1] 
  1. Nuclear Electric plc., Bedminster Down (United Kingdom)
Publication Date:
Mar 01, 1991
Product Type:
Technical Report
Report Number:
AEA-TRS-1057
Reference Number:
SCA: 210200; PA: AIX-23:022818; SN: 92000682058
Resource Relation:
Other Information: PBD: Mar 1991
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; R CODES; LOSS OF COOLANT; COOLANT LOOPS; FORCED CONVECTION; NATURAL CONVECTION; PWR TYPE REACTORS; STRUCTURAL MODELS; 210200; POWER REACTORS, NONBREEDING, LIGHT-WATER MODERATED, NONBOILING WATER COOLED
Sponsoring Organizations:
Nuclear Electric plc, Bedminster Down (United Kingdom)
OSTI ID:
10126064
Research Organizations:
AEA Reactor Services, Winfrith (United Kingdom)
Country of Origin:
United Kingdom
Language:
English
Other Identifying Numbers:
Other: ON: DE92619121; TRN: GB9105398022818
Availability:
OSTI; NTIS (US Sales Only); INIS
Submitting Site:
GBN
Size:
78 p.
Announcement Date:
Jul 04, 2005

Citation Formats

Holmes, B J. LOBI test BT-15/BT-16 pre-test calculation. United Kingdom: N. p., 1991. Web.
Holmes, B J. LOBI test BT-15/BT-16 pre-test calculation. United Kingdom.
Holmes, B J. 1991. "LOBI test BT-15/BT-16 pre-test calculation." United Kingdom.
@misc{etde_10126064,
title = {LOBI test BT-15/BT-16 pre-test calculation}
author = {Holmes, B J}
abstractNote = {LOBI is a higher pressure, electrically heated integral system facility simulating a KWU 1300 MW PWR scaled 1:712 by volume, although full scale has been maintained in the vertical direction. In order to complete the test programme before the facility is closed in 1991 a number of tests have been performed in tandem, where the test procedures were compatible. BT-15/BT-16 is one such composite test. In their original form both tests BT-15 and BT-16 simulated a loss of main feedwater transient with delayed auxiliary feedwater injection, with the pumps running in BT-15 and tripped in BT-16. The aim of each test was to investigate the loss of primary/secondary heat transfer as the steam generator secondary sides boiled down, and the subsequent recovery of heat transfer as the auxiliary feedwater was tripped on. Due to a re-scheduling of the test programme there was insufficient time to perform sensitivity studies and so only one, base case, calculation is presented. (author).}
place = {United Kingdom}
year = {1991}
month = {Mar}
}