Abstract
LOBI is a higher pressure, electrically heated integral system facility simulating a KWU 1300 MW PWR scaled 1:712 by volume, although full scale has been maintained in the vertical direction. In order to complete the test programme before the facility is closed in 1991 a number of tests have been performed in tandem, where the test procedures were compatible. BT-15/BT-16 is one such composite test. In their original form both tests BT-15 and BT-16 simulated a loss of main feedwater transient with delayed auxiliary feedwater injection, with the pumps running in BT-15 and tripped in BT-16. The aim of each test was to investigate the loss of primary/secondary heat transfer as the steam generator secondary sides boiled down, and the subsequent recovery of heat transfer as the auxiliary feedwater was tripped on. Due to a re-scheduling of the test programme there was insufficient time to perform sensitivity studies and so only one, base case, calculation is presented. (author).
Holmes, B J
[1]
- Nuclear Electric plc., Bedminster Down (United Kingdom)
Citation Formats
Holmes, B J.
LOBI test BT-15/BT-16 pre-test calculation.
United Kingdom: N. p.,
1991.
Web.
Holmes, B J.
LOBI test BT-15/BT-16 pre-test calculation.
United Kingdom.
Holmes, B J.
1991.
"LOBI test BT-15/BT-16 pre-test calculation."
United Kingdom.
@misc{etde_10126064,
title = {LOBI test BT-15/BT-16 pre-test calculation}
author = {Holmes, B J}
abstractNote = {LOBI is a higher pressure, electrically heated integral system facility simulating a KWU 1300 MW PWR scaled 1:712 by volume, although full scale has been maintained in the vertical direction. In order to complete the test programme before the facility is closed in 1991 a number of tests have been performed in tandem, where the test procedures were compatible. BT-15/BT-16 is one such composite test. In their original form both tests BT-15 and BT-16 simulated a loss of main feedwater transient with delayed auxiliary feedwater injection, with the pumps running in BT-15 and tripped in BT-16. The aim of each test was to investigate the loss of primary/secondary heat transfer as the steam generator secondary sides boiled down, and the subsequent recovery of heat transfer as the auxiliary feedwater was tripped on. Due to a re-scheduling of the test programme there was insufficient time to perform sensitivity studies and so only one, base case, calculation is presented. (author).}
place = {United Kingdom}
year = {1991}
month = {Mar}
}
title = {LOBI test BT-15/BT-16 pre-test calculation}
author = {Holmes, B J}
abstractNote = {LOBI is a higher pressure, electrically heated integral system facility simulating a KWU 1300 MW PWR scaled 1:712 by volume, although full scale has been maintained in the vertical direction. In order to complete the test programme before the facility is closed in 1991 a number of tests have been performed in tandem, where the test procedures were compatible. BT-15/BT-16 is one such composite test. In their original form both tests BT-15 and BT-16 simulated a loss of main feedwater transient with delayed auxiliary feedwater injection, with the pumps running in BT-15 and tripped in BT-16. The aim of each test was to investigate the loss of primary/secondary heat transfer as the steam generator secondary sides boiled down, and the subsequent recovery of heat transfer as the auxiliary feedwater was tripped on. Due to a re-scheduling of the test programme there was insufficient time to perform sensitivity studies and so only one, base case, calculation is presented. (author).}
place = {United Kingdom}
year = {1991}
month = {Mar}
}