You need JavaScript to view this

Feasibility study for a prototype offshore wind turbine. V. 2

Abstract

There are five main factors determining choice of site for a prototype wind turbine. These are restrictions due to interference with other interests; representative of possible wind farm site; proximity to suitable grid connection point; cost of construction and installation; and availability of sea bed and environmental information for design. A procedure for choosing a site is outlined, and potential sites are described. (author)
Publication Date:
Dec 31, 1993
Product Type:
Technical Report
Report Number:
ETSU-W-35/00251/REP/B
Reference Number:
SCA: 170100; 170604; PA: GB-93:053764; EDB-94:035284; NTS-94:010650; ERA-19:008631; SN: 94001144587
Resource Relation:
Other Information: PBD: 1993
Subject:
17 WIND ENERGY; WIND TURBINES; FEASIBILITY STUDIES; PILOT PLANTS; OFFSHORE OPERATIONS; SITE SELECTION; 170100; 170604; RESOURCES AND AVAILABILITY (CLIMATOLOGY); SITE CHARACTERISTICS
Sponsoring Organizations:
AEA Environment and Energy, Harwell (United Kingdom)
OSTI ID:
10125982
Research Organizations:
Renewable Energy Systems Ltd., Hemel Hempstead (United Kingdom)
Country of Origin:
United Kingdom
Language:
English
Other Identifying Numbers:
Other: ON: DE94740082; TRN: GB9353764
Availability:
OSTI; NTIS (US Sales Only)
Submitting Site:
GB
Size:
216 p.
Announcement Date:
Jul 04, 2005

Citation Formats

None. Feasibility study for a prototype offshore wind turbine. V. 2. United Kingdom: N. p., 1993. Web.
None. Feasibility study for a prototype offshore wind turbine. V. 2. United Kingdom.
None. 1993. "Feasibility study for a prototype offshore wind turbine. V. 2." United Kingdom.
@misc{etde_10125982,
title = {Feasibility study for a prototype offshore wind turbine. V. 2}
author = {None}
abstractNote = {There are five main factors determining choice of site for a prototype wind turbine. These are restrictions due to interference with other interests; representative of possible wind farm site; proximity to suitable grid connection point; cost of construction and installation; and availability of sea bed and environmental information for design. A procedure for choosing a site is outlined, and potential sites are described. (author)}
place = {United Kingdom}
year = {1993}
month = {Dec}
}