Abstract
The start-up of a PWR nuclear power plant must be done within safety criteria and requires a simulation. The design of some equipment, cost and time can be optimized. A computer simulator, which allows control of all the equipment and variables into the operation, has been developed and is presented in this paper. The KWU procedure and an alternative for Angra II were simulated. The results are showed up. 09 refs, 03 figs. (B.C.A.).
Faraco-Medeiros, M A;
Leite, C A.T.;
Ramalho, F P
[1]
- PROMON Engenharia SA, Rio de Janeiro, RJ (Brazil)
Citation Formats
Faraco-Medeiros, M A, Leite, C A.T., and Ramalho, F P.
Numerical simulation of the heating and start-up of PWR nuclear power station; Simulacao numerica do aquecimento e partida de centrais nucleares PWR.
Brazil: N. p.,
1992.
Web.
Faraco-Medeiros, M A, Leite, C A.T., & Ramalho, F P.
Numerical simulation of the heating and start-up of PWR nuclear power station; Simulacao numerica do aquecimento e partida de centrais nucleares PWR.
Brazil.
Faraco-Medeiros, M A, Leite, C A.T., and Ramalho, F P.
1992.
"Numerical simulation of the heating and start-up of PWR nuclear power station; Simulacao numerica do aquecimento e partida de centrais nucleares PWR."
Brazil.
@misc{etde_10124703,
title = {Numerical simulation of the heating and start-up of PWR nuclear power station; Simulacao numerica do aquecimento e partida de centrais nucleares PWR}
author = {Faraco-Medeiros, M A, Leite, C A.T., and Ramalho, F P}
abstractNote = {The start-up of a PWR nuclear power plant must be done within safety criteria and requires a simulation. The design of some equipment, cost and time can be optimized. A computer simulator, which allows control of all the equipment and variables into the operation, has been developed and is presented in this paper. The KWU procedure and an alternative for Angra II were simulated. The results are showed up. 09 refs, 03 figs. (B.C.A.).}
place = {Brazil}
year = {1992}
month = {Dec}
}
title = {Numerical simulation of the heating and start-up of PWR nuclear power station; Simulacao numerica do aquecimento e partida de centrais nucleares PWR}
author = {Faraco-Medeiros, M A, Leite, C A.T., and Ramalho, F P}
abstractNote = {The start-up of a PWR nuclear power plant must be done within safety criteria and requires a simulation. The design of some equipment, cost and time can be optimized. A computer simulator, which allows control of all the equipment and variables into the operation, has been developed and is presented in this paper. The KWU procedure and an alternative for Angra II were simulated. The results are showed up. 09 refs, 03 figs. (B.C.A.).}
place = {Brazil}
year = {1992}
month = {Dec}
}