You need JavaScript to view this

Temperature growth-up and mechanical loads on ENEA facility CICC test

Abstract

ENEA (Italian Agency for New Technoligies, Energy and the Environment), under an ITER Technology Task (MSUB2-Stability, Ramp Rate and AC Loss Experiments for ITER), is engaged in the test of a 12 T coil, made by a cable-in-conduit Nb3S n conductor with the wind and react approach. The Task proposal is to face many of the technological problems that will be met in the construction of the ITER magnet. The coil will undergo an a. c. test (ITER relevant) at ENEA. Here the preliminary numerical analysis, performed using the MSC/EMAS code, on the a.c. test are reported. The results concern the forces and the temperature growths for ohmic dissipation due to eddy currents on the metallic structures surrounding the coil.
Authors:
Gasparotto, M; Pasotti, G; Roccella, M; [1]  Lucca, F
  1. Associazione EURATOM-ENEA sulla Fusione, Frascati (Italy)
Publication Date:
Dec 31, 1994
Product Type:
Conference
Report Number:
ETDE-IT-95-13; CONF-9409296-1
Reference Number:
SCA: 700430; PA: ITA-95:000065; EDB-95:049354; SN: 95001347483
Resource Relation:
Conference: MSC European users` conference,Turin (Italy),19-20 Sep 1994; Other Information: PBD: 1994
Subject:
70 PLASMA PHYSICS AND FUSION TECHNOLOGY; THERMONUCLEAR REACTOR MATERIALS; MAGNETS; ITER TOKAMAK; MAGNET COILS; M CODES; EDDY CURRENT TESTING; 700430; MAGNET COILS AND FIELDS
OSTI ID:
10124087
Research Organizations:
ENEA, Frascati (Italy). Dipt. Fusione
Country of Origin:
Italy
Language:
English
Other Identifying Numbers:
Other: ON: DE95749713; TRN: IT9500065
Availability:
OSTI; NTIS (US Sales Only)
Submitting Site:
ITA
Size:
18 p.
Announcement Date:
Jul 04, 2005

Citation Formats

Gasparotto, M, Pasotti, G, Roccella, M, and Lucca, F. Temperature growth-up and mechanical loads on ENEA facility CICC test. Italy: N. p., 1994. Web.
Gasparotto, M, Pasotti, G, Roccella, M, & Lucca, F. Temperature growth-up and mechanical loads on ENEA facility CICC test. Italy.
Gasparotto, M, Pasotti, G, Roccella, M, and Lucca, F. 1994. "Temperature growth-up and mechanical loads on ENEA facility CICC test." Italy.
@misc{etde_10124087,
title = {Temperature growth-up and mechanical loads on ENEA facility CICC test}
author = {Gasparotto, M, Pasotti, G, Roccella, M, and Lucca, F}
abstractNote = {ENEA (Italian Agency for New Technoligies, Energy and the Environment), under an ITER Technology Task (MSUB2-Stability, Ramp Rate and AC Loss Experiments for ITER), is engaged in the test of a 12 T coil, made by a cable-in-conduit Nb3S n conductor with the wind and react approach. The Task proposal is to face many of the technological problems that will be met in the construction of the ITER magnet. The coil will undergo an a. c. test (ITER relevant) at ENEA. Here the preliminary numerical analysis, performed using the MSC/EMAS code, on the a.c. test are reported. The results concern the forces and the temperature growths for ohmic dissipation due to eddy currents on the metallic structures surrounding the coil.}
place = {Italy}
year = {1994}
month = {Dec}
}